Saint Paul, MN
Saint Paul, MN
199
2
1
HPC. CONVERT 2 BEDROOMS INTO 1 AND REMODEL BATHROOM. NO STRUCTURAL CHANGES ANTICIPATED. The following "Trade" Permits are required for this project: Electrical, W.Air Vent, Plumbing, The following "Trade" Permits are required for this project: Electrical, W.Air Vent, Plumbing, STRUCTURAL LICENSED ENGINEERING REVISION ADDED, JOE CAIN, MN # 40119 04.08.25 MAILED OUT PERMIT/PLACARD AND STAMPED DRAWING (SB)
HPC. RE-SIDE ROOF DORMERS ONLY (SAME MATERIAL AS ROOF). RE-ROOF FLAT.
HPC - BATHROOM REMODEL; REPLACE TUB WITH NEW DROP-IN BATH (LIKE FOR LIKE). REUSE EXISTING VANITY AND PLUMBING. NEW FINISHES. NO STRUCTURAL CHANGES The following "Trade" Permits are required for this project: Electrical, W.Air Vent, Plumbing, The following "Trade" Permits are required for this project: Electrical, W.Air Vent, Plumbing,
HPC - REPAIRS TO WALLS AND CEILINGS DAMAGED BY WATER ON 1ST AND LOWER LEVEL. The following "Trade" Permits are required for this project: Electrical, Plumbing,
HPC - REPLACING 4 WINDOWS - 1 IN BED 1/ 1 IN BED 2 / 1 IN STAIR / 1 IN KITCHEN
HPC - 11.04 KW DC FLUSH ROOF MOUNT PV SOLAR INSTALL ON THE RESIDENCE. ADD-ON TO EXISTING SYSTEM. TESLA POWERWALL 3 BATTERY INSTALL The following "Trade" Permits are required for this project: Electrical, The following "Trade" Permits are required for this project: Electrical, 12/10/24: MAILED PERMIT, PLACARD & STAMPED DRAWINGS – AC
HPC - ROOFING
HPC - RE-ROOF HOUSE
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.