Shakopee, MN
Shakopee, MN
9
6
$89,650
Add (10) extended coverage sprinkler heads from existing overheads wet system in new restrooms and break room.
• No new metering • Remove existing dust collector breaker from 480v panel • Utilize existing 1” conduit from 480v panel to grid line 9 • Install new 1” conduit from grid line 9 to grid line 3. • Install new 480v panel between grid line 3 and 4 on East exterior wall • Install new 30kva step-down transformer from 480v to 208v • Install new 90 amp 120/208v loadcenter panel • Furnish and install (18) 2x4 LED flat panel lay-in fixtures • Furnish and install (2) exit emergency fixtures • Wiring for switches
Tenant remodel: Installation of 2 restrooms; 1 drinking fountain, Breakroom sink; warehouse mop sink w-water heater
Building Spec Suite include two new restrooms
Rebuilt RPZ, serial #3K10852.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.