Saint Cloud, MN
Saint Cloud, MN
16
2
excavation spot repair of lateral sewer line
Lite Kitchen Remodel- I wasn't planning on needing to pull a permit. We weren't planning on pulling out more than 100SF of wall. We opened a can of worms and found out there was intermitant existing insulation on the existing 2x4 walls and no attic insulation at the angled soffit above the cabinets. - Existing 2x4 wall framing to remain. -Supply and install new 2x4 R-13 FG Batt Insul and 4 mil VB. (Only at the fridge and sink walls.) -New drywall as needed. -New Floor, trim, cabinets, and counter tops. -Note: Existing roof framing is 2x6 hand frame rafters. Install chutes and FG batt insul w/ VB. Note: My electrican did already pull an electrical permit. I was hoping to have a framing inspection at the same time as the electrical RI
Kitchen Remodel. Rework existing counter receptacles to accommodate countertop (if counter is changing). Add new disk lights in kitchen.
Furnace & AC Replacement
excavation spot repair of lateral sewer line
RECONNECT FURNACE AND AC
Furnace & A/C Replacement
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.