This amendment adds one smoke detector in the new lower-level conference room, installed per the attached map and connected to the existing addressable fire alarm circuit. The circuit serving the current detector can accommodate the additional device without new wiring, and both detectors will be mounted to the cement ceiling as shown. Work includes installation, integration into the existing monitoring service, and maintenance for the new device. All work will comply with NFPA 72 and local AHJ requirements under the required permit.
Add lights and outlets in lower south west office space
BUILD OUT EXISTING ACCESSIBLE TOILET ROOM AND NEW OPEN OFFICE ENVIRONMENT. THIS INCLUDES NEW SHEETROCK WALLS TO DECK. NEW DOORS, DOOR FRAMES AND HARDWIRE, ELECTRICAL, AND BATHROOM FIXTURES.