100 3RD AVE S #1001, Minneapolis
New condo flooring laid over 2mm "floorMuffler" brand underlayment published data STC 73 and IIC 74 While a permit is not required for flooring replacement work, the work must comply with the building code (the proposed flooring and underlayment would co
1001 3RD AVE S, Minneapolis
INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __349.440__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a as applicable. ADDITIONAL PERMITS: PV SYSTEMS ALSO R
1001 43RD AVE N, Minneapolis
Replacing existing air conditioning system with new Lennox 2 ton, 13 SEER air conditioner.
1001 3RD AVE S, Minneapolis
Duct and related modifications to convert single office to two.
1001 3RD AVE S, Minneapolis
office and data equipment remodeling on 5th floor. sck certificate of occupancy required: no ***** const type: 1a ***occupancy: b ***2020 MSBC*****sprinklered: yes ***** architect: gensler
1001 3RD AVE S, Minneapolis
INTERIOR FINISHES AND ELECTRICAL/MECHANICAL UPGRADES (MAA) ARCHITECT: DAVID BROZ 46394
1001 3RD AVE S, Minneapolis
HVAC system adding one dedicated outside air unit with chilled water & hot water coils, eight computer room air handling units with chilled water coils, two hydronic fan coli units, electric steam boiler, six VAV boxes, supply diffusers, return grills and
1001 3RD AVE S, Minneapolis
DEMO EXISTING FIXTURES and install new fixtures on 4th floor. Relocate floor drain
1001 3RD AVE S, Minneapolis
Non-Structural Interior Demo for Future Data Center Space Applicant must document all disruption of fire proofing and fire rated assemblies for restoration under future building permit. Occupancy, construction type, exiting, etc TBD by future permit
1001 3RD AVE S, Minneapolis
Adding 2 Offices to Existing Tenant certificate of occupancy required: no ***** mechanical plans required for certificate of occupancy***** mechanical plans/letter of means of compliance submitted\***** special inspections required: no***** const typ
1001 43RD AVE N, Minneapolis
water heater
1001 43RD AVE N, Minneapolis
CONSTRUCT_10_ X _12_ TREATED WOOD DECK AT REAR YARD OF TFD WITH 2 X_8_ JOISTS, (sza) 2X_8_ BEAMS, GUARDRAIL, STAIRS, HANDRAIL, TREATED WOOD POSTS AND FOOTING LOCATIONS. Grippable handrail height 34-38 above nose of tread required at 4 or more risers.
1001 3RD AVE S, Minneapolis
SELECT DEMO & MODIFY ENTRY INTO 5TH FLOOR DATA CENTER AREA WITH NEW PARITION WALL TO CREATED SECURED ENTRY LOBBY AND ADJACENT MAN'D SECURITY STATION. (DMH#2) SECURED BIOMETRIC ENTRY DOOR INTO DATA AREA AND SECURITY STATION ROOM. UPDATE CARPET AND ELE
1001 3RD AVE S, Minneapolis
1001 3RD AVE S, Minneapolis
REMODEL CAFETERIA AND RESTROOMS - 5TH FLOOR certificate of occupancy required NO special inspections required NO const type: I-A occupancy: A-2 2015 MSBC occupant load: NO CHANGE sprinklered: YES Tenant: SELECT COMFORT Fl
1001 3RD AVE S, Minneapolis
5TH FLOOR CAFETERIA AND RESTROOMS - SELECT COMFORT
1001 3RD AVE S, Minneapolis
5TH FLOOR CAFETERIA AND RESTROOMS - MODIFY KITCHEN HOOD AND DISHWASHER EXHAUST SYSTEM
1001 3RD AVE S, Minneapolis
REMOVE EXISTING ROOF PAVERS AND REPLACE 2,550 SQUARE FEET OF EXISTING EPDM ROOFING MEMBRANE PER WORK SPECIFICATIONS WORKSHEET. AAJ#2 ***NOTE: PER APPLICANT, NO INSULATION WILL BE INSTALLED*** TENANT: DCI TECHNOLOGY HOLDINGS, LLC. SEE WORK S
1001 3RD AVE S, Minneapolis
TENANT IMPROVEMENT OF EXISTING OFFICE SPACE IN A COMMERCIAL BUILDING. AAJ#1 certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspection
1001 3RD AVE S, Minneapolis
FOR 4 NEW RESTROOMS & 3 REMODELED RESTROOMS: FIXTURES WITH WASTE AND VENT INCLUDED. PROVIDE DOMESTIC HOT WATER AND COLD WATER AS NEEDED.
1001 3RD AVE S, Minneapolis
tenant remodel approx. 201630 s.f. special inspections required yes level 3 alteration per 2015 mn conservation code const type: I-A occupancy: B + F-1 2015 MSBC occupant load: 3816 sprinklered: yes energy code chapter used: 2012
1001 3RD AVE S, Minneapolis
VENTILATION EQUIPMENT (2) DAIKIN AHU'S @ 20,000 CFM EACH (MUA & (1) WITH RA, A/C EQUIPMENT - (7) DAIKIN FAN COILS 37MBH EACH, NEW VAV'S - HOT WATER, CHILLED WATER, MAKE-UP AIR PER ENGINEERED DRAWINGS.
1001 3RD AVE S, Minneapolis
REMODEL FLOORS 1, 2 AND 3 ADD 6 BREAK ROOM SINKS; ELECTRIC WATER HEATERS, REPLACE WATER CLOSET AND LAV. ADD 2 EMERGENCY EYE WASH STATIONS. ADD MOTHERS ROOM SINKS ON 2ND AND 3RD FLOORS. UTILITY SINKS. DOMESTIC HW AND CW. DISHWASHERS ICE MAKERS AND COF
100 3RD AVE S #1001, Minneapolis
clean out stack
1001 3RD AVE S, Minneapolis
NON STRUCTURAL INTERIOR DEMO TO EXISTING OFFICE BUILDING (WSS) certificate of occupancy required no special inspections required no const type: TYPE 1 occupancy: B 2015 MSBC occupant load: NA sprinklered: yes Tenant: SLEE