Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
1001 3RD AVE S, Minneapolis
(DMH-Pdox) INTERIOR DEMO ONLY TO 3RD & 4TH FLOORS. - 2020 MNSBC Architect: BRIAN BAILEY, #63902 (Palanisami Assoc) APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIRED TO PRINT COPIES OF ELECT
100 3RD AVE S #1001, Minneapolis
gas range and dryer
1001 3RD AVE S, Minneapolis
electrical room expansion for switching equipment upgrades - 1st floor. certificate of occupancy required: no const type: 1a 2020 MSBC sprinklered: yes architect: Gensler Architects
100 3RD AVE S #1001, Minneapolis
dishwasher
1001 43RD AVE N, Minneapolis
Replace furnace in lower level of duplex
1001 3RD AVE S, Minneapolis
Installation of FO piping for existing generators. 10 generators are located on the 6th floor, and 8 generators are on the roof. New piping is connecting to existing pipe system on garage level and will connect to all existing generators. Review comments
1001 3RD AVE S, Minneapolis
HVAC system for data center on 4th and 5th floors, installing coolant distribution units, chilled doors, data center air handling units, buffer tanks, expansion tanks and all associated piping.
1001 3RD AVE S, Minneapolis
HVAC system installation on the 5th and 6th floor, installing chillers, heat exchanger, hydronic pumps, cooling tower, air separator and chilled/condenser water piping, per approved plan.
1001 3RD AVE S, Minneapolis
minor alterations due to mechanical/electrical/plumbing upgrades. 5th floor heat exchange 2.
1001 3RD AVE S, Minneapolis
minor alterations related to generator room upgrades.
1001 3RD AVE S, Minneapolis
minor alterations due to mechanical/electrical/plumbing upgrades. 5th floor service order 1.
1001 23RD AVE NE, Minneapolis
Remove and replace vinyl siding on the house.
1001 23RD AVE NE, Minneapolis
Re-Roof the house with Owens Corning Duration Shingles and Re-Roof the low slope portions with CertainTeed Flintlastic 3-Ply system.
1001 3RD AVE S, Minneapolis
updated drawings related to BLDG1107881 engineer: palanasami
1001 3RD AVE S, Minneapolis
additional updates to drawing set for BLDG1107881
1001 3RD AVE S, Minneapolis
additional work in conjunction with BLDG1107881.
1001 3RD AVE S, Minneapolis
5th, 6th, and roof top alterations for significant mechanical upgrades. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDITIONING/VENTILATION WORK. occupancy: B 2020 MSBC sprinklered: yes architect: Jeffrey Wal
1001 3RD AVE S, Minneapolis
West cooling tower plant and battery room upgrades certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDITIONING/VENTILATION WORK. occupancy: B
1001 3RD AVE S, Minneapolis
Chiller work. Most, but not all work will be in the existing chiller rooms. BLDG1104077
1001 3RD AVE S, Minneapolis
new PDU distribution - Levels 4, 5, & 6 new floors (See bldg1087202 for work previously done) (JJL) certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B & S-2 2020 MSBC sprin
1001 3RD AVE S, Minneapolis
COOLING TOWERS. (JJL) CORE 42 DATA CENTER UPGRADE. ENGINEER: P. PALANISAMI #11381 SPECIAL INSPECTIONS: YES - AET
1001 3RD AVE S, Minneapolis
Tenant Improvement - Levels 4, 5, & 6 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B & S-2 2020 MSBC sprinklered: yes 20% accessibility upgrades: Ambulatory Toilet Stal
1001 43RD AVE N, Minneapolis
METER MOVE Q2 - 2024 BATCH #23
1001 3RD AVE S, Minneapolis
For CDUs (Condensing Units) & RDHXs (rear-door heat exchangers) shall obtain separate permit. Installing 6 computer room air-handling units, buffer tanks, piping per approved plans. BLDG1084409
1001 3RD AVE S, Minneapolis
Interior Demo Only - Building Core Finishes and Ductwork - Levels 4 & 5 certificate of occupancy required: no special inspections required: no occupancy: B 2020 MSBC sprinklered: yes
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.