Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
1000 NICOLLET MALL, Minneapolis
7th floor breakroom sink with insta hot water heater floor drain for ice maker
1000 NICOLLET MALL, Minneapolis
7TH FLOOR OFFICE DEMO/BUILDOUT.
1000 NICOLLET MALL, Minneapolis
MINOR RECONFIGURATION OF OFFICE AND CONF ROOM AND 2 NEW OFFICES AT WESTSIDE AT SUITE 8TH FLOOR (MAA#02)
1000 NICOLLET MALL, Minneapolis
OFFICE/CONFERENCE ROOM AT 14TH FLOOR OFFICES (JAG) ALTER EXISTING LARGER CONF TO CREATE SMALLER CONF AND OFFICE. MATCH EXISTING CONSTRUCTION. certificate of occupancy required: no
1000 NICOLLET MALL, Minneapolis
12TH FLOOR DEMO OF SIX ENCLOSED OFFICE SPACES, BUILDOUT ENCLAVE AND 3 SMALL CONFERENCE ROOMS. REPLACE CARPETING, REMOVE VINLY FINISHES AS NOTED ON PLANS. (LAH) certificate of occupancy required N/A mechanical plans required for certificate of occupa
1000 NICOLLET MALL, Minneapolis
VAV, FAN COIL AND DUCTWORK MODIFICATIONS, 26TH FLOOR
1000 NICOLLET MALL, Minneapolis
Repipe heating water to 5 reheat coils, 5th floor.
1000 NICOLLET MALL, Minneapolis
office alterations on 26th floor. sck#2
1000 NICOLLET MALL, Minneapolis
minor office alterations on 5th and 6th floors. sck#2
1000 NICOLLET MALL, Minneapolis
RELOCATE 1 FPVAV, MODIFY EXISTING DUCTWORK, ADD NEW FPVAV, REZONE FOR NEW LAYOUT PER ENGINEERED DRAWINGS
1000 NICOLLET MALL, Minneapolis
21ST FLOOR BUILD OFFICE AND CONFERENCE ROOM (WSS) )certificate of occupancy required no special inspections required no const type: TYPE 1 occupancy: B 2015 MSBC occupant load: NO CHANGE sprinklered: yes Tenant: TARGET Floor(s):21ST FLOOR SAC- 0 per M
1000 NICOLLET MALL, Minneapolis
remodel offices on 29th floor. sck#1 certificate of occupancy required no const type: 1a occupancy: b 2015 MSBC sprinklered: yes Tenant: target Floor(s): 29th architect: engineer:
1000 NICOLLET MALL, Minneapolis
29th floor refresh- new fixtures
1000 NICOLLET MALL, Minneapolis
water piping and drain to combi oven
1000 NICOLLET MALL, Minneapolis
remodel tenant space certificate of occupancy required no
1000 NICOLLET MALL, Minneapolis
8th FLR NORTH TOWER - FAN POWERED VAV'S AND DUCT DISTRIBUTION PER ENGINEERED DRAWINGS
1000 NICOLLET MALL, Minneapolis
*B-R/R BUSINESS OCCUPANCY REMODEL OR REPAIR REMODEL EXISTING TENANT SPACE (OFFICE) IN EXISTING MIXED-USED COMMERCIAL BUILDING. AAJ#1 certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter
1000 NICOLLET MALL, Minneapolis
Target - 8th floor refresh - provide piping to (3) FPVAV /HW boxes
1000 NICOLLET MALL, Minneapolis
FOR SOUTH TOWER 8TH FLOOR REFRESH- REWORK DUCTWORK - BALANCE VAV'S - HW PIPING BY HORWITZ
1000 NICOLLET MALL, Minneapolis
6TH FLOOR - REMOVE, RELOCATE EXISTING AND NEW DUCTWORK , DIFFUSERS, & VAV'S PER ENGINEERED DRAWINGS 6TH FLOOR - REMOVE, RELOCATE EXISTING AND NEW DUCTWORK , DIFFUSERS, & VAV'S PER ENGINEERED DRAWINGS
1000 NICOLLET MALL, Minneapolis
8th floor remodel offices on 8th floor. sck#1
1000 NICOLLET MALL, Minneapolis
8th floor demo office remodeling on 8th floor. sck#1
1000 NICOLLET MALL, Minneapolis
Relocating 2 existing fpvav's on 6th floor relocating 2 existing fpvav's on 6th floor
1000 NICOLLET MALL, Minneapolis
refreshing plumbing on 8th floor north tower refreshing plumbing on 8th floor north tower
1000 NICOLLET MALL, Minneapolis
refreshing plumbing on 8th floor south tower refreshing plumbing on 8th floor south
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.