Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
1000 NICOLLET MALL, Minneapolis
INSTALL COFFEE MAKER, NEW BREAKROOM SINK WITH ON DEMAND HOT WATER HEATER, FLOOR DRAIN FOR ICE MAKER. INSTALL NON-TESTABLE RPZ.
1000 NICOLLET MALL, Minneapolis
Rework existing duct work and diffusers, 3 new VAV's and hot water piping.
1000 NICOLLET MALL, Minneapolis
remodel 19th floor open offices. sck#1 certificate of occupancy required: no special inspections required: no occupancy: b 2015 MSBC sprinklered: yes 20% accessibility upgrades______fully accessible____ Tenant: target
1000 NICOLLET MALL, Minneapolis
21ST FLOOR, SOUTHWEST CORNER OF BUILDING - MINOR REMODEL. ADDING (2) ROOMS TO FLOOR. REMOVING ENCLAVE NEAR OFFICES TO ALLOW FOR PROPER CORRIDOR WIDTH. NO EGRESS OR STRUCTURAL CHANGES. NEW WALL CONSTRUCTION TO MATCH EXISTING WALL CONSTRUCTION. SPRINK
1000 NICOLLET MALL, Minneapolis
15TH FLOOR DEMO AND REWORK DUCTWORK TO INCLUDE (2)VAV'S & (1) FPVAV PER ENGINEERED DRAWINGS
1000 NICOLLET MALL, Minneapolis
move 2 water coolers install new fixtures on 15th floor
1000 NICOLLET MALL, Minneapolis
interior remodel of 11th floor - single tenant open offices. sck#1 certificate of occupancy required: no const type: 1a occupancy: b 2015 MSBC sprinklered: yes 20% accessibility upgrades_____fully accessible_____ Tenant:
1000 NICOLLET MALL, Minneapolis
interior remodel of 15th floor - single tenant open offices. sck#1 certificate of occupancy required: no const type: 1a occupancy: b 2015 MSBC sprinklered: yes 20% accessibility upgrades_____fully accessible_____ Tenant: ta
1000 NICOLLET MALL, Minneapolis
INSTALL TWO FPVAV'S ON 6TH FLOOR/SOUTH TOWER
1000 NICOLLET MALL, Minneapolis
NORTH TOWER/12TH FLOOR - FPVAV'S VENTILATION WORK PER ENGINEERED DRAWINGS
1000 NICOLLET MALL, Minneapolis
SOUTH TOWER/21ST FLOOR - NEW VAV & DUCTWORK
1000 NICOLLET MALL, Minneapolis
HOT WATER PIPING FROM MAIN TO FP-VAV ON 12TH FLOOR
1000 NICOLLET MALL, Minneapolis
6TH FLOOR/SOUTH PLAZA - DUCT MODIFICATIONS NEW VAV's AND FPVAV's PER ENGINEERED DRAWING
1000 NICOLLET MALL, Minneapolis
remodel 6th floor offices. sck#2 certificate of occupancy required no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required yes no const type: 1a occu
1000 NICOLLET MALL, Minneapolis
breakroom sink, water heater and floor drain for ice maker
1000 NICOLLET MALL, Minneapolis
TENANT BUILD OUT FOR ONE NEW CONFERENCE ROOM AND OFFICE ROOM IN EXISTING SUITE 2100 - TARGET PLAZA SOUTH. AAJ#2. certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of comp
1000 NICOLLET MALL, Minneapolis
REMOVE EXISTING TURNSTILES AND INSTALL FIVE NEW TURNSTILES @ 3'7" WIDE ON MAIN FLOOR OF TARGET PLAZA SOUTH. AAJ#2. certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of
1000 NICOLLET MALL, Minneapolis
NEW DUCTS & DIFFUSERS FOR 7TH FLOOR
1000 NICOLLET MALL, Minneapolis
REWORK DUCTS, DIFFUSERS, AND HOT WATER VAV'S FOR 10TH FLOOR
1000 NICOLLET MALL, Minneapolis
DUCTS & DIFFUSERS FOR NEW FLOOR PLANS ON 31ST FLOOR
1000 NICOLLET MALL, Minneapolis
31st floor refresh - adding break room
1000 NICOLLET MALL, Minneapolis
remodel offices on 31st floor - single tenant. sck#1 sprinklered: yes Tenant: Floor(s): sac: _0_charges met council letter dated _2/28/18_ architect: gilmore
1000 NICOLLET MALL, Minneapolis
FOR 10TH FLOOR BREAKROOM - SINK, FLOOR, ELECTRIC WATER HEATER AND HOT WATER DISPENSER
1000 NICOLLET MALL, Minneapolis
10th floor demo and buildout of offices and conferences. sck#1 const type: 1a occupancy: b 2015 MSBC sprinklered: yes sac: _0_charges met council letter dated _2/9/18_ architect: gilmore
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.