1000 NICOLLET MALL, Minneapolis
TENANT REMODEL certificate of occupancy required: NO special inspections required: YES - FIRE RATED PENTRATIONS const type: I occupancy: B 2015 MSBC occupant load: NO CHANGE sprinklered: YES Tenant: TARGET Floor(s): 29 sac
1000 NICOLLET MALL, Minneapolis
DUCT MODS / RELOCATE DIFFUSERS / FP VAV W HW COIL
1000 NICOLLET MALL, Minneapolis
INTERIOR REMODEL OF 28TH FLOOR. SCK#1 certificate of occupancy required: no const type: 1A occupancy: B 2015 MSBC sprinklered: yes Tenant: TARGET Floor(s): 28 : _0charges met council letter dated _12/20/18
1000 NICOLLET MALL, Minneapolis
INTERIOR REMODEL OF 23RD FLOOR. SCK#1 certificate of occupancy required: no const type: 1A occupancy: B 2015 MSBC sprinklered: yes Tenant: TARGET Floor(s): 23 : _0charges met council letter dated _12/28/18
1000 NICOLLET MALL, Minneapolis
23rd floor breakroom remodel
1000 NICOLLET MALL, Minneapolis
2ND FL - BALL VALVE REPLACEMENT OF ILLEGAL T VALVE
1000 NICOLLET MALL, Minneapolis
14TH FLOOR BUILDOUT. OFFICE 1442 ADDING WALLS/DOOR TO MAKE OFFICE. NON COMUBUSTIBLE CONSTRUCTION. TEMPERED GLASS. 170 SF ONLY (JJL) certificate of occupancy required: no mechanical plans required for certificate of occupancy NOT SUBMITTED mech
1000 NICOLLET MALL, Minneapolis
Refer to attached drawings.
1000 NICOLLET MALL, Minneapolis
Target-New test kitchen on 4th floor
1000 NICOLLET MALL, Minneapolis
remodel 6th floor offices. sck#1 certificate of occupancy required: no const type: 1a occupancy: b 2015 MSBC sprinklered: yes 20% accessibility upgrades___new toilet rooms_______ Tenant: target Floor(s): 16th sa
1000 NICOLLET MALL, Minneapolis
16th floor breakroom remodel
1000 NICOLLET MALL, Minneapolis
7TH FLOOR SOUTH TOWER - 2 FP VAV'S
1000 NICOLLET MALL, Minneapolis
30TH FLOOR BATHROOM SINK ICE MAKER FLOOR DRAIN ELECTRIC WATER HEATER COFFEE MAKER AND TESTABLE BACKFLOW
1000 NICOLLET MALL, Minneapolis
Refer to drawings.
1000 NICOLLET MALL, Minneapolis
Refer to Plans.
1000 NICOLLET MALL, Minneapolis
1000 NICOLLET MALL, Minneapolis
SELECT DEMO AND REMODEL TO EXISTING 4TH FLOOR EAST END OFFICE USE AND TEST KITCHENS. APPROX 10,000 S.F SPACE. (DMH#1) SELECT MECHANICAL UPDATES FOR KITCHEN HOODS. NO CHANGE IN EXITS OR USE. Const type: 1B Occupancy: B 2015 MSBC occup
1000 NICOLLET MALL, Minneapolis
2 new Make-up air units, 2 new Fan-Coil units, 7 new kitchen exhaust fans , 4 new VAV boxes & duct works with grills. Refer to attachment for more info.
1000 NICOLLET MALL, Minneapolis
4th floor 2 make up air units (by others) piping and installing 2 fan coil units
1000 NICOLLET MALL, Minneapolis
buildout 2 offices on 29th floor and remodel entire 30th floor. sck#1 certificate of occupancy required: no const type: 1a occupancy: b 2015 MSBC sprinklered: yes Tenant: target architect: gilmore
1000 NICOLLET MALL, Minneapolis
7th floor demo and build out of offices. sck#1 certificate of occupancy required: no const type: 1a occupancy: b 2015 MSBC sprinklered: yes Tenant: target Floor(s): 7 sac: _0_charges met council letter dated _8/8/1
1000 NICOLLET MALL, Minneapolis
REMOVE EXISTING TURNSTILES ON FLOOR #2. REMOVING EXISTING WALL, REPLACING WITH NEW GLASS WALL. REMOVING OLD TURNSTILES, INSTALLING NEW TURNSTILES. CHANGING FLOORING. MUST BE TEMPERED GLASS. (JJL)
1000 NICOLLET MALL, Minneapolis
19TH FLOOR SOUTH TOWER - piping 6 FPVAV'S.
1000 NICOLLET MALL, Minneapolis
MINOR DEMO AND BUILD-OUT TO 3RD FLOOR, SUITE 323, FOR APPROX 1,440 S.F TRAINING ROOM. (DMH#2) Const type: 1-A Occupancy: B 2015 MSBC occupant load: 76 sprinklered: YES 20% accessibility upgrades: FULLY/COMPLIANT Tenant: TARGET CORP. Floo
1000 NICOLLET MALL, Minneapolis
19TH FLOOR SOUTH TOWER -- duct modifications, new diffusers, and 8 new VAV's.