Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
1000 NICOLLET MALL, Minneapolis
HVAC alteration, reusing existing fan-powered and VAV boxes, GRDs and all associated ductwork. Refer to attached drawings.
1000 NICOLLET MALL, Minneapolis
Rework of 8th floor of North Plaza tower to add (4) single user restrooms and (3) break room sinks.
1000 NICOLLET MALL, Minneapolis
PLAZA NORTH 8TH FLOOR - FULL REFRESH certificate of occupancy required: no const type: 1-B occupancy: B 2020 MSBC occupant load: no change sprinklered: yes architect: J Mayhew #20203
1000 NICOLLET MALL, Minneapolis
Chilled water and condensate piping for one fan-coil per attached plan.
1000 NICOLLET MALL, Minneapolis
T/I - BUILD LAB, 6TH FLOOR TARGET PLAZA certificate of occupancy required: no special inspections required: no 2020 MSBC architect: Mayhew, Joseph Edward - 20203 engineer:
1000 NICOLLET MALL, Minneapolis
Alteration of HVAC system at 5th floor, installing one chilled water fan-coil unit, three fan powered boxes with hot water reheat coils, nine VAV boxes, GRDs and all associated ductwork. Refer to attached drawings.
1000 NICOLLET MALL, Minneapolis
1ST FLOOR TRAINING LAB PLUMBING BUILDOUT: Buildout of training lab on 1st floor. Includes (1) hose bibb for water and (1) floor drain, and piping to a relocated compressed air hose reel.
1000 NICOLLET MALL, Minneapolis
partial 5th floor refresh of Target Plaza South certificate of occupancy required: no const type: 1-B occupancy: B 2020 MSBC occupant load: no change sprinklered: yes architect: J E Mayhew #20203 Structural: N Joh
1000 NICOLLET MALL, Minneapolis
REMOVE AND REPLACE MEMBRANE ROOFING OVER NEW TAPERED INSULATION
1000 NICOLLET MALL, Minneapolis
FOR 5TH FLOOR - NEW UNISEX RESTROOM PLUMBING
1000 NICOLLET MALL, Minneapolis
(DMH-ProjectDox) MINOR DEMO AND REMODEL TO 2,696 SQFT FIRST FLOOR OFFICE USE "SMART LAB". NO CHANGE IN EXIT OR CORRIDOR. Const type: 1-B Occupancy: B 2020 MSBC Occupant Load: -- (Archit calc.) LESS THAN 50. Sprinkled:
1000 NICOLLET MALL, Minneapolis
HVAC system alteration, rezoning VAV boxes and adding exhaust system, GRDs and all associated ductwork. Refer to attached drawings.
1000 NICOLLET MALL, Minneapolis
REWORK AND REPLACE SINK IN LOADING DOCE MAINTENANCE OFFICE
1000 NICOLLET MALL, Minneapolis
demo bathroom for minute clinic
1000 NICOLLET MALL, Minneapolis
REROOF AND SHEET METAL WORK (MAA)
1000 NICOLLET MALL, Minneapolis
5th floor break room
1000 NICOLLET MALL, Minneapolis
5TH FLOOR TARGET PLAZA SOUTH - OFFICES DEMO & BUILDOUT certificate of occupancy required: no special inspections required: no const type: 1-B occupancy: B 2020 MSBC occupant load: 300 sprinklered: yes 20% accessibility
1000 NICOLLET MALL, Minneapolis
Rework restroom carrier group to shift over (1) water closet
1000 NICOLLET MALL, Minneapolis
Rework of existing ductwork and GRDs and adding 5 new VAV boxes per attached drawings.
1000 NICOLLET MALL, Minneapolis
3rd Floor - Half Renovation certificate of occupancy required: no special inspections required: no const type: 1B occupancy: B 2020 MSBC sprinklered: yes 20% accessibility upgrades: Ambulatory Accessible Toilet Stall in Men'
1000 NICOLLET MALL, Minneapolis
9th floor break room
1000 NICOLLET MALL, Minneapolis
interior remodel of offices on 9th floor - target plaza south. sck certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes Tenant: target Floor(s): 9 sac: _0_ charges met c
1000 NICOLLET MALL, Minneapolis
HVAC system modification, utilizing existing fan-powered and VAV boxes and adding one new fan-powered and 5 VAV boxes, GRDs and all associated ductwork. Refer to attached drawings.
1000 NICOLLET MALL, Minneapolis
T/I REMODEL 9TH FLOOR 'TARGET' // DEMO EXISTING BUILD-OUT W NO CHANGE TO RATED ASSEMBLIES, SHAFT ENCLOSURES, ELEVATOR LOBBIES, BATHROOMS // BUILD-OUT NEW OFFICE SPACE ----- architect: EAMES GILMORE - 19441 construction type: I-B occupancy: B -
1000 NICOLLET MALL, Minneapolis
HVAC system, modification of chilled water piping adding new fan-coil unit, modifying hot water piping to 2 relocated fan-powered boxes. Relocation of fan-powered boxes, duct work and temperature control aren't part of this permit application. Refer to at
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.