Saint Cloud, MN
Saint Cloud, MN
42
2
$14,433
1
09-080 ISD #742 MULTI ATHLETIC FACILITY - TEMP SERVICE (480V,400A, 3P - PAD MOUNTED TRANSFORMER)
J9199 - EMT Lab Renovation
Demo plumbing and install underground piping, new flammable waste trap, (1) sink and (1) laundry tub
19-080 SCWTP BOOSTER PUMP - WIRE PUMP
BUILDING ENERGY WALL AROUND EXTERIOR OF LAUNDRY ROOM. HANG DRYWALL AND DROP CEILING. INSTALL INTERIOR DOOR.
Laundry room remodel
Install main service entrance 200A breaker between Xcel meter and load center. Install PV system and necessary components: panels, rooftop wiring, rooftop junction boxes, drop-in, 8 space breaker panel, PV fused disconnect, production meter base w/100a infeed breaker, and associated wiring for supply-side feed.
Install rooftop solar arrays as approved by Xcel for interconnection. 19.44kW, 48x405W panels on Ironridge rafter-attached racking. New 50yr roof installed as of 10/8/25. Panel arrangement in plans is subject to minor modification.
Service Upgrade
Replace Split System Condenser and Air Handler
Installing storm water treatment system, storm sewer, water service, and sewer service.
09-066 ISD 742 SMALL JOBS FCO#24 APOLLO HIGH SCHOOL
Replacing control valves. Connecting hydronic pipe to new AHUs.
R&R existing asphalt shingles on home.
01-296 APOLLO HIGH SCHOOL THEATER IMPROVEMENTS
Replace Roof Drains Roof A
Replace Roof Drains B roof
CIRCUIT FOR WATER PUMP, CONNECT CIRCUIT FOR OUTLET IN DINING ROOM, ADD LIGHT IN UTILITY ROOM
Work includes reconstruction of the parking lot area on the north side of the Apollo High School.