Mechanical (HVAC sheeyt metal work) - Administration office remodel (Gonda 1st level - 7R120360)
100 SW 3 AVE, Rochester
Electrical - Administration office remodel (Gonda 1st level - 7R120360) PO 602596-1-910-E
1006 NW 13 AVE, Rochester
Mechanical - replace old furnace
100 SW 3 AVE, Rochester
Electrical work for week ending 09/22/2012 MAYO - GONDA 12-133 REC / WO306133, 17-100 REM / WO306082, & LO-163 REC / WO306437
100 SW 3 AVE, Rochester
Electrical work for week ending 09/15/2012 MAYO - GONDA 12-133 REC / WO306133, 17-226 REM / WO302567, 3-160 REM / WO302199-R4926, & 3-433 REM / WO303573-R4995
100 SW 3 AVE, Rochester
Plumbing - repair leaks on hot water heaters MAYO - GONDA UL-104 EQUIPMENT ROOM PRIMARY / WO306645
100 SW 3 AVE, Rochester
ELECTRICAL work for the week ending 09/08/2012 MAYO - GONDA 19-151 REM / WO301024-R4845
100 SW 3 AVE, Rochester
ELECTRICAL work for the week ending 09/01/2012 MAYO - GONDA 19-121 REM / WO304108-R5033
100 SW 1 AVE, Rochester
ELECTRICAL work for the week ending 09/01/2012 MAYO - 1ST AVE BUILDING 6A-101 REC / WO305181
100 SW 3 AVE, Rochester
PLUMBING - install chlorination ports on all the tempered water/city water cross-ties MAYO - GONDA UL-104 EQUIPMENT ROOM PRIMARY / WO306184
100 SW 3 AVE, Rochester
ELECTRICAL work for week ending 08/18/2012 MAYO - GONDA 14-450 REM / WO305258
123 SW 16 AVE, STE# 100, Rochester
Gas Piping - Tenant finish from Partial Phase permit (Cherry Berry - Shoppes on 2nd - Bldg A) See also permit #R11-0032CB for partial phase permit
100 SW 1 AVE, Rochester
ELECTRICAL work for week ending 08/18/2012 MAYO - 100 1st AVE BUILDING BA-101B REM / WO304761
100 SW 3 AVE, Rochester
ELECTRICAL work for week ending 08/18/2012 MAYO - GONDA 7-400-6A REC / WO305510
100 SW 3 AVE, Rochester
PLUMBING - install new bathroom MAYO - GONDA 12-SOUTH / WO305992
100 SW 3 AVE, Rochester
PLUMBING - replace shut-off valves on hot & cold water mains MAYO - GONDA M1-100A PIPE CHASE / WO305946
100 SW 3 AVE, Rochester
PLUMBING - relocate safety eyewash & tie in drain MAYO - GONDA LO-433 DOCK / WO305864
100 SW 3 AVE, Rochester
ELECTRICAL work for the week of 08/04/2012 MAYO - GONDA M1-400 REM / WO301304, & GONDA 19-121 REM / WO304108-R5033
100 SW 3 AVE, Rochester
Hydronic (install hydronic piping to nine (9) new VAV'S) - Gonda Lumbar Puncture Relocation (Mayo - Gonda 8 - 7R110460)
1004 SE 15 AVE, Rochester
Plumbing (drain, waste, vent and water piping) - Repair fire damage and upgrade building - duplex. Replace/repair floor joist and some wall framing, replace stair system to upper unit, lower level basement for mechanicals and laundry only. Total refurbish of both units, insulation, drywall, windows.
1004 SE 15 AVE, Rochester
Gas Piping - Repair fire damage and upgrade building - duplex. Replace/repair floor joist and some wall framing, replace stair system to upper unit, lower level basement for mechanicals and laundry only. Total refurbish of both units, insulation, drywall, windows.
1006 SW 14 AVE, Rochester
Electrical - wire new a/c and add exterior receptacle
100 SW 2 AVE, Rochester
Electrical (temperature controls) - Alterations for Venables Learning Center (Mayo - Siebens 10th - Mayo Project 7R120060
100 SW 2 AVE, Rochester
Alterations for Venables Learning Center (Mayo - Siebens 10th - Mayo Project 7R120060
100 SW 3 AVE, Rochester
ELECTRICAL work for week ending 07/21/2012 MAYO - GONDA 14-450 REM / WO305258