100 SW 3 AVE, Rochester
MAYO - GONDA BUILDING-02-352D: LIBRARY - NEW READING ROOM - WO 370591 R8906 THIS WORK IS T&M NIGHTS
100 SW 2 AVE, Rochester
ELECTRICAL WORK FOR INSTALL OF SOURCE EQUIPMENT FOR SNOW MELT SYSTEM- MAYO# ROXX20C0340 EGAN FOREMAN: JOHN PRUDOEHL 507-208-5584 EGAN JOB# 610161-910
1008 SW 21 AVE, Rochester
Electrical - adding electrical circuits for lighting and electrical outlets to deck. Addition of deck /w stairs, screen porch and covered deck.
100 SW 3 AVE, Rochester
Disconnect supply and return piping to (1) VAV box, reconnect the piping after replacement. Per the project blueprints
100 SW 2 AVE, Rochester
Mayo # ROXX20C0340 Provide and install new steam-to-hot water heat exchanger and associated pumps in basement of Siebens Building and then connect to new snowmelt system mains which are being brought in by other contractor.
100 SW 2 AVE, Rochester
MAYO - PLUMMER: 19-01 EQUIPTMENT ROOM PRIMARY - INSTALL AUDIO EQUIPTMENT AND COMPUTER FOR LIVESTREAMING - WO 371454 R8998 THIS WORK IS T&M
1005 NE 8 AVE, Rochester
Install Water Heater
1009 SE 8 AVE, Rochester
Bathroom fan, return air and supply vents to be added to the basement
3908 NW 19 AVE, APT# 100, Rochester
Skinning 8 decks on the back side of the building, will replace any rotten wood that is found. We will be installing composite decking boards.
1009 SE 8 AVE, Rochester
1 tub, 1 toilet, 1 lav - basement finish
1009 SE 8 AVE, Rochester
Basement finish
1009 SE 8 AVE, Rochester
Basement finish; 4'x 10' deck and stairs (Revised 4/19/21 MAT) | Deck Addition
100 SW 2 AVE, Rochester
MAYO - PLUMMER BUILDING-BA-09: MAINTENANCE SHOP - INSTALL CONDUIT AND POWER - WO 372764 THIS WORK IS T&M
100 SW 3 AVE, Rochester
MAYO - GONDA BUILDING-05-238: OFFICE - OFFICE REMODEL - WO 369624 R8842 THIS WORK IS T&M NIGHTS MAYO - GONDA BUILDING-03-165 - INSTALL NEW ESPRESSO MACHINE - WO 369322 R8858 THIS WORK IS T&M
1005 NW 4 AVE, Rochester
Bathroom and small kitchen remodel on second floor apartment of a two unit future rental home. Remodel will include replacing galvanized supply lines form basement with PEX. Kitchen sink and bathroom share a wall. The bathroom will have plumbing relocated to accommodate a shower stall, washer and dryer/vent, toilet, and vanity/sinK. The kitchen will have new cabinets and new sink and faucet. New wiring will be installed to support the washer and dryer in the bathroom along with an electric range/oven + exhaust vent and refrigerator. Egress window added to this permit. | Other
1005 NW 4 AVE, Rochester
Bathroom remodel and replace piping 21-6134
100 SW 3 AVE, Rochester
MAYO - GONDA BUILDING-14-344: PROCEDURE/IMAGING - 14-344 ROOM DR CONVERSION - WO 365258 R8598 THIS WORK IS T&M NIGHTS
1005 SW 21 AVE, Rochester
Electrical Fireplace
1005 SW 21 AVE, Rochester
A/C replacement
1005 SW 21 AVE, Rochester
Gas line for fireplace insert
100 SW 3 AVE, Rochester
Radiology room conversion (SMC-Gonda 14 / R8598)
1005 SW 23 AVE, Rochester
Kitchen remodel | Other
100 SW 3 AVE, Rochester
Electrical - replaced 4- 7.5 hp VFDs (MA1, MA2, MA3, MA4) Gonda Subway level 170C (Krohnberg, Juenger)
100 SW 2 AVE, Rochester
Electrical - transformer grounding (45 and 15 KVA transformers were not properly grounded when originally installed). Transformers (2) located SI-M1-E1. Electrical panels located SI-12-00A1 - Krohnberg, Boland
100 SW 3 AVE, Rochester
Electrical - replace 50 Hp VFD. Gonda 2M 300 area, R11 - Elwood