Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
100 5TH ST S, Minneapolis
19TH FLOOR - RELOCATE (4) DIFFUSERS
100 5TH ST S, Minneapolis
FOR 5TH FLOOR RESTROOMS - REPLACE EXISTING PLUMBING. REWORK PLUMBING IN MENS ROOM. INSTALL WASTE,VENT AND WATER FOR NEW RESTROOM
100 5TH ST S, Minneapolis
tenant expansion 13th floor and new finishes 14th certificate of occupancy required: no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required: no const t
100 5TH ST S, Minneapolis
DEMO AND REMODEL 5TH FLOOR MENS AND WOMENS RESTROOMS. PROVIDE NEW SINGLE USER ADA RESTROOM. (DMH#1) MENS AND WOMENS PROVIDED WITH AMBULATORY STALLS. FRAME AND FINSH FOR CIRCULAR CORRIDOR. Const type: I-A Occupancy: B 2015 MSBC occup
1000 5TH ST SE, Minneapolis
HEAT/VENT/AC, ROOFTOP UNIT, BATH EXHAUST, MINI-SPLIT SYSTEMS (4), HW BOILER, PRV
2100 5TH ST NE, Minneapolis
add bath kitchen sink bath remodel
2100 5TH ST NE, Minneapolis
2 fans, AC, and space heating unit
2100 5TH ST NE, Minneapolis
REMODEL ATTIC FOR MASTER SUITE INCLUDING BATHROOM AND BEDROOM. REMODEL KITCHEN AND BATHROOM ON FIRST FLOOR. SCK#2 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIR
100 5TH ST S, Minneapolis
1000 5TH ST SE, Minneapolis
INTERIOR REMODEL AND ADDITION OF 3717 SQFT 3RD LEVEL ONTO EXISTING DORM BUILDING FOR KAPPA SIGMA. (MAA #02) NUMBER OF DORM ROOMS: LEVEL 01 = 2, LEVEL 02 = 12, LEVEL 03 = 12; TOTAL = 26 certificate of occupancy required YES - THIRD FLOOR ADDITION
100 5TH ST S, Minneapolis
heat pump
1000 5TH ST SE, Minneapolis
3 washer boxes sink 2 restroom kitchen sink range
100 5TH ST S, Minneapolis
9th floor heat pumps and duct distribution
100 5TH ST S, Minneapolis
Install 19 heat pumps and supply air ductwork.
100 5TH ST S, Minneapolis
BUILD OUT 3RD FLOOR 100 TOWER shell space for future tenant. certificate of occupancy required no special inspections required yes const type: occupancy: B 2015 MSBC occupant load: II-A sprinklered: yes energy code chapter used:
100 5TH ST S, Minneapolis
RELOCATE DIFFUSERS (3) AND THERMOSTAT (1)
100 5TH ST S, Minneapolis
DUCTWORK RELOCATE AND MODIFICATION
100 5TH ST S, Minneapolis
MINOR DEMO AND OFFICE REMODEL TO 2,443 S.F SPACE FOR OFFICE EXPANSION. (DMH#1) NO CHANGE EXITS OR CORRIDORS. EXISTING ELEVATOR LOBBY. Const type: 1-A Occupancy: B 2015 MSBC occupant load: 63 (Archit calc.) sprinklered: YES 20% acce
100 5TH ST S, Minneapolis
REMODEL CORRIDOR AND ADD SINGLE USER TOILET ROOM ON 9TH FLOOR. SCK#1
100 5TH ST S, Minneapolis
BUILDOUT 5 SPEC OFFICE SUITES ON 9TH FLOOR. SCK#1
100 5TH ST S, Minneapolis
FOR 9TH FLOOR: DRINKING FOUNTAIN, LAVATORY, 5 ELECTRIC WATER HEATERS, 5 FLOOR DRAINS, TOILET, AND 5 KITCHEN SINKS
100 5TH ST S, Minneapolis
BAR AND KITCHEN
5100 35TH AVE S, Minneapolis
REPLACE (18) WINDOW INSERTS ONLY
100 5TH ST S, Minneapolis
SUITE 2000 - 2 HEAT PUMPS - (relocate one & add one) & RELOCATE DIFFUSERS
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.