Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
100 5TH ST S, Minneapolis
18TH FLOOR TENANT BUILD-OUT FOR 4,839 S.F. OFFICE SPACE. INSTALL PARTITION WALLS FOR CONFER. RM., OFFICES, AND EMPLOYEE BREAK ROOM, SEE ARCHITECT NOTE SHEET A7.1 (DMH#1) ABOUT ENGINEERING FOR ANGLED AWNING WALLS. NO CHANGES TO EXISTING CORRIDOR.
100 5TH ST S, Minneapolis
FOR 3RD FLOOR/THREE BRIDGES BUILDOUT - ROUGH IN AND FINISH KITCHEN SINK, DISHWASHER AND 3 COFFEE MAKERS
100 5TH ST S, Minneapolis
INSTALL HEAT PUMP FOR CONFERENCE ROOM RELOCATE DIFFUSERS
100 5TH ST S, Minneapolis
Minor Remodel to Spec Office Suite certificate of occupancy required: yes special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 329 sprinklered: yes Tenant: Threebridge Floor(s): 3 arch
100 5TH ST S, Minneapolis
BASE BUILDING IMPROVEMENTS - 21st FLOOR ELEVATOR LOBBY ENCLOSURE MUST COMPLY WITH THE REQUIREMENTS FOR SMOKE PARTITIONS (MSBC SECTION 710) certificate of occupancy required: no special inspections required: no const type: 1A occupancy:
1000 5TH ST SE, Minneapolis
FIREPLACE AND FIRE PITS/GRILLS
100 5TH ST S, Minneapolis
DEMO ONLY TO 21ST FLOOR CORRIDOR, LOBBY AND RESTROOMS. (DMH#2) ADDITIONAL PLANS, PERMITS AND APPROVALS REQUIRED. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. IT IS THE RESPONSIBILITY OF THE PERMIT APPLICANT TO
100 5TH ST S, Minneapolis
21ST FLOOR CORRIDOR - REPLACE GRD'S
100 5TH ST S, Minneapolis
rework rest room on 21st floor add ada restroom
100 5TH ST S, Minneapolis
Remodel of 17th floor lobby, bathrooms, and addition of new accessible bathroom. certificate of occupancy required no special inspections required no const type: IA occupancy: B 2015 MSBC occupant load: sprinklered: yes
100 5TH ST S, Minneapolis
NKF COMPANY/21S FLOOR - (5) HEAT PUMPS & CORE WATER
100 5TH ST S, Minneapolis
M & K COMPANY/13TH FLOOR - 2 NEW HEAT PUMPS & CORE WATER
100 5TH ST S, Minneapolis
suite 2100 - interior tenant buildout certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 49 sprinklered: yes Tenant: Newmark Knight Frank Floor(s):
100 5TH ST S, Minneapolis
5TH FLOOR/COLLABERA - 4 HEAT PUMPS, DUCTWORK & CORE WATER
100 5TH ST S, Minneapolis
SUITE 810 WATER FOR REFRIGERATOR ROTATE THE EXISTING SINK WASTE AND WATER TO THE OTHER SIDE OF THE WALL
100 5TH ST S, Minneapolis
suite # 810 move existing plumbing for sink
100 5TH ST S, Minneapolis
SUITE 518 4 FIXTURES
1000 5TH ST SE, Minneapolis
temp heat
100 5TH ST S, Minneapolis
INTERIOR REMODEL OF UNIT#500 (MAA #02) certificate of occupancy required yes no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required yes no const type: IIA
1000 5TH ST SE, Minneapolis
fire place
2100 5TH ST NE, Minneapolis
range
100 5TH ST S, Minneapolis
suite 810 APPROX 1,984 SAF- tenant remodel AT OFFICE TOWER (JAG) certificate of occupancy required:no special inspections required:no const type: 1-A occupancy: B 2015 MSBC occupant load: 20 sprinklered: yes energy code chapter us
100 5TH ST S, Minneapolis
REMOVE PARTITION IN RECEPTION AREA TO CONVERT WORK SPACE (MAA #02) certificate of occupancy required yes no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required y
100 5TH ST S, Minneapolis
INTERIOR DEMOLITION OF EXISTING TENANT SPACE IN PREPARATIOION FOR FUTURE OF SPACE IN EXISTING FIFTH STREET TOWERS BUILDING certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of
100 5TH ST S, Minneapolis
5TH FLOOR - (2) HEAT PUMPS @ 2 TON EACH, DUCTWORK AND CORE WATER
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.