Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
4100 45TH AVE S, Minneapolis
VENT HOOD, REROUTE S/A, REMOVE 1 RADIATOR, UNINSTALL-REINSTALL 2 RADIATORS, INSTALL 2 HOT WATER TOE KICK HEATERS, REROUTE 1 SET FEEDER PIPES
4100 45TH AVE S, Minneapolis
STRUCTURAL REMODEL KITCHEN/BASMENT INSULATION. Applicant to have print-out of LVL sizing on site at the framing inspection. Down-draft exhaust out north wall
1100 15TH AVE SE, Minneapolis
Replacing AC and furnace
100 5TH ST S, Minneapolis
INSTALL 1 HEAT PUMP & PIPE TO EXISTING VALVES
100 5TH ST S, Minneapolis
Tenant Expansion certificate of occupancy required: no ***** mechanical plans required for certificate of occupancy***** mechanical plans/letter of means of compliance submitted\***** special inspections required: no***** const type: 1A ***o
3100 35TH AVE S, Minneapolis
RE-ROOF HOUSE
100 5TH ST S, Minneapolis
FIXTURES FOR 7TH FLOOR RESTROOMS
100 5TH ST S, Minneapolis
5TH FLOOR break room 9 fixtures
100 5TH ST S, Minneapolis
TENANT BUILDOUT FOR EXPANSION OF EXISTING OFFICE SPACE ON 5TH FLOOR OF 100 TOWER COMMERCIAL BUILDING . AAJ#1 certificate of occupancy required yes no mechanical plans required for certificate of occupancy mechanical plans/letter of means of complian
1100 55TH ST W, Minneapolis
Laundry Dryer, Range/Cooktop
1100 15TH AVE SE, Minneapolis
Replacing AC
1100 55TH ST W, Minneapolis
Supplies and Returns with fans
1100 55TH ST W, Minneapolis
w/v, h/c water lines for Master bath, 1st fl. laundry, Kitchen, Basement bath, Basement bar, Basement laundry
100 5TH ST S, Minneapolis
FOR 7TH FLOOR RESTROOMS - REPLACE 6 LAVATORIES INCLUDING FAUCETS
100 5TH ST S, Minneapolis
Adding three heat pump units and associated ductworks and supply diffusers to renovate the level one partial area. The outside air ducts are existing. Refer to attached drawings.
1100 55TH ST W, Minneapolis
Note: NW room in basement ceiling height too low to be a legal bedroom (As per Vicki Carey). SFD STRUTURAL REMODEL OF MAIN FLOOR INCLUDING DEMO OF CENTER BEARING WALL (INSTALL LVL BEAMS) AND RELOCATING INTERIOR STAIRWAY; CONVERT EXISTING
100 5TH ST S, Minneapolis
SUITE 2100, 21ST FLOOR. STEEL STUDS, MISC OFFICES.***********************CONFIRM OFFICE SLIDING DOORS HAVE ADA HARDWARE PER SECTION 404.2.6 OF THE MN ACCESIBILITY CODE.*************************(JJL) certificate of occupancy required: no *****
4100 55TH ST E, Minneapolis
12 x 20 detached garage on new slab. East wall 1 -hr rated with 4 inch overhang. Both 16 inch walls flanking the OHD require the pair of imbedded straps and other portal framing provisions.
100 5TH ST S, Minneapolis
ADD 1 NEW HEAT PUMP AND DUCT FOR NEW LAYOUT PER PLANS
100 5TH ST S, Minneapolis
RELOCATE DIFFUSERS FOR NEW CEILING ON 7TH FLOOR
2100 5TH ST NE, Minneapolis
REPLACE EXISTING LOW APPROX 8 X 5 REAR LANDING W/ WRAP STAIRS AT REAR EXISTING COVERED ENTRY AT SFD (JAG)*** NEW POST FOUNDATION (2) WITH 20 INCH BASES AND WRAP EXISTING POSTS. 2 X 8 STRUCTURE. *** MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE
100 5TH ST S, Minneapolis
interior demo suite #2100
100 5TH ST S, Minneapolis
NON STRUCTURAL INTERIOR DEMOLITION OF SUITE #2500 OF A COMMERCIAL BUILDING. AAJ#2. certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special ins
100 5TH ST S, Minneapolis
suite # 700 interior remodel AT APPROX 1/2 AREA OF FULL FLOOR TENANT OFFICES (JAG)*** NOTE: IF CORE DRILLING IS DONE, PROVIDE INSPECTOR ENGINEERING AND SPECIAL INSPECTION INFORMATION PRIOR TO WORK.*** certificate of occupancy required : no*** mechanica
100 5TH ST S, Minneapolis
suite#2000 demo sink install 2 sinks 1 water heater point of use water heater , coffee , ice and dishwasher 20th floor suite # 2000
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.