Minneapolis, MN
Minneapolis, MN
43
11
$21,782,015
Connect hose lines from the chiller truck location to the (4) zones as specified. Connect the chiller hoses then to the pre-manufactured pans that creates the ice for the event. This works has a total of (5) pipe zones that will create (2) regulation siz
Renovation of an existing Target Field space to add a training locker room. Addition of sinks, shower, mop sink, associated domestic and waste and vent piping.
Move two doors. No impact on rated assemblies or exiting
Men's locker room and storage room remodel certificate of occupancy required: no special inspections required: no const type: I-A occupancy: A-3 2020 MSBC occupant load: plus 10 sprinklered: yes architect: Miller #45717
INSTALL ELECTRIC HEATERS FOR VARIOUS AREAS FOR THE WINTER CLASSIC 2021
INSTALL 1 FAN COIL UNIT IN CONFERENCE ROOM / CHILLED WATER
REMODEL SUITE AT TARGET FIELD. SUITES 21 AND 22. REMOVING NON LOAD BEARING WALL. NEW FINISHES. PERMIT DOES NOT INCLUDE ANY EXTERIOR SEATING OR BAR MODIFICATION OUTSIDE THE SUITE. (JJL)***************** ARCHITECT: SKD ARCHITECTS.****************
CRAETE A CONFERENCE (APROX. 630 SQFT)ROOM NEAR SUITE 51 (MAA)
CONVERT 3 OFFICES INTO 4 OFFICES (MAA)
7 HANDWASHING SINKS FOR GUEST SUITES
ADDING NON-LOAD BEARING WALLS AND DOOR TO SERVICE LEVEL (-2 FLOOR). HOUSE KEEPING AREA OR GENERAL STORAGE AREA NEAR LEFT FIELD. NON-COMBUSTIBLE CONSTRUCTION. RELOCATE SPRINKLERS AS NEEDED. (JJL)
REVISE DUCTWORK AT GATE #8
minor office alterations - 5th floor area 27. sck#2
New data equipment room in existing storage room. ARCHITECT: HGA - Josh Stowers #44389
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.