Minneapolis, MN
Minneapolis, MN
470
4
$2,793,250
Re-work of chilled water pipe in Clearway Energy's Vault 124 at the corner of 9th Street S and LaSalle Ave
unit 1700 break room sink
INSTALL SOLAR SYSTEM ON ROOF ______ COLLECTOR CAPACITY 53.3 kWDC ______ See engineer's letter signed by Bryant Loehr (MN PE license 49036) dated 03-17-21. Engineer states if assumptions are incorrect then conclusions are void. ______
Reconfiguration of HVAC system utilizing and adding VAV & fan-powered boxes, hydronic piping,supply diffusers, return grilles and all associated duct work. Refer to attached drawings.
Reconfiguration of HVAC system utilizing existing system adding a new fan-powered box, supply diffusers, return grilles and all associated duct work. Refer to attached drawings.
REMOVE EXISTING AND INSTALL TWO NEW SLIDING GLASS PATIO DOORS IN TWO EXISTING OPENINGS AT CONDO UNIT 1503. NO CHANGE IN SIZE, FUNCTION OR LOCATION. NO PLANS. occupancy: R-2 2020 MSBC 2020 MN BUILDING CODE (2018 IBC)/2020 MN ENERGY CODE (20
Steam boiler repair.
FOR SUITE 1750 BREAKROOM Install sink, waste, vent, CW, electric water heater and HW piping to sink. CW extended to coffee maker and refrigerator.
FOR SUITE 950 BREAKROOM - Remove existing sink so new solid surface countertop can be installed. Install new ADA undermount sink at existing sink rough-in.
INTERIOR REMODEL OF SUITE 1750 (MAA) certificate of occupancy required: NO const type: I A occupancy: B 2020 MSBC occupant load: 140 sprinklered: YES Tenant: PEREGRINE Floor(s): 17TH FLOOR sac: _3.33_ charges _3
(DMH - ProjectDox) SELECT DEMO OF EXISTING OFFICE PARTITION WALLS AND INSTALL NEW DEMISING WALLS TO DECREASE OFFICE SPACE TO 3,593 SQ.FT. NO CHANGE IN EXITING OR CORRIDORS. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVI
Replace existing 2.5 ton air handling unit.
Remove hardwood and install new hardwood in kitchen.
Partial remodeling of HVAC system adding four dedicated outside air units, two rooftop units with gas heat, fan-coil units, heat pump units, hydronic piping, supply diffusers, return grilles and all associated duct work. Refer to attached drawings.
fire damage repairs in unit 304. sck
Remodel 1st Floor Fountain Area Stairs: 7 maximum riser height, 11 minimum tread depth. Guards shall be located along the open sides of stairs, ramps, and landings that are located more than 30 inches measured vertically to the floor or grade below.
Shower liner and shower valve.
Install fireplace venting. Permit application indicates 4 locations.
GAS LINE FOR FIRE PLACE. 190,000 BTUs OF GAS
NON-STRUCTURAL BATHROOM REMODEL. MAINTAIN FIRE AND SOUND RATINGS AT WALL AND FLOOR ASSEMBLIES.
FOR LOBBY FOUNTAIN - DEMO DRAIN
Common Laundry room washing machine stand pipe replacement
REMODEL HALL BATHROOM
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.