BATHROOM REMODEL UNIT 2004 The building inspector must inspect and approve fire stop of floor drain rough-in and all other disrupted fire or acoustical assemblies certificate of occupancy required: no const type: 1-A occupancy: R-2
TENANT IMPROVEMENT. EXPANSION OF TENANT SPACE TO WHOLE FLOOR. NO CHANGE TO EXITING OR STRUCTURAL WORK. (JJL) certificate of occupancy required: no ***** special inspections required: no***** const type: IA ***occupancy: B, A-3
INSTALLING ONE SHOWER
FOR FLOORS 2 - 6, 5 TEMPORARY HEATERS AT 350000 BTU EACH. HEATERS WILL BE REMOVED IN THE SPRING.
Replace dishwasher
******Shall provide dedicated cooling unit for elevator hoist-way as specified.****** ******PTAC units condensate shall be piped and discharged into condensate riser for new addition.***** ******Approved base on PTAC unit with dedicated outsi
Replacement of existing boilers. Replacement boilers are greater than 400K BTUH each.
REPLACE (4) STEAM PRESSURE REDUCING VALVES
Reset new Fixtures in same locations of Bathroom
REMODEL EXISTING BATHRROM OF UNIT #701 OF EXISTING APARTMENT BUILDING. AAJ ( PROJECT DOX PLAN AND DOCUMENT). - REPLACE EXISTING BATH TUB WITH NEW SHOWER WITH SHAMPOO NICHE. AND FLOOR TILES - REPLACE BATHROOM FIXTURES WITH NEW FIXTURES IN SAME LOCAT
Adding three ductless split system with one condenser for remodeled area and two ERV to supply the ventilation. Refer to attached drawing.
GAS LINE TO GRILL
REMOVING AND ADDING ANTENNAS. ADDING DISTRIBUTION BOXES. THE EXISTING ANTENNA STRUCTURE DOES REQUIRE STRUCTURAL MODIFICATIONS. THE EXISTING BUILDING IS ADEQUATE TO HANDLE THE NEW EQUPMENT INSTALLED. (JJL) HERZOG ENGINEERING. THOMAS MACH #42357 SPECI
NEW CONSTRUCTION ADDING TO BUILDING AND SELECTIVE REHAB
full depth slab replacement in middle exit lane of parking garage. engineer: Building Consulting Group
Demo and cap 2 existing fixtures and install a water cLoset, lavatory, shower, floor drain and kitchen sink
TENNANT IMPROVEMENT -- REMODEL SUITE 2200 // FINISHES, MINOR RECONFIGURING OF SPACE ----- MAINTAIN FIRE PROTECTION OF STRUCTURAL ELEMENTS ----- occupancy: B cnst type: I-A sprinkled: YES ----- 2020 Minnesota State Building Code ----- ----- I
(DMH-ProjectDox) INSTALLATION OF "LIFEPROOF" FLOATING BAMBOO FLOORING WITH BUILT-IN SOUND MATTING IN MASTER BEDROOM LOCATION OF CONDO UNIT #1302. 441 SQFT. PER APPLICATION. APPLICANT TO PROVIDE PRODUCT MATERIAL AND LABELING TO INSPECTOR AT TIME OF
Replace sink in community room.
REMODEL AMENITY SPACE certificate of occupancy required: no special inspections required: no const type: I-B occupancy: R-2 2020 MSBC occupant load: no change sprinklered: yes architect: Udris #45587 engineer: wi
Replace four supply diffusers and one return grille for new ceilings in Community Room.
REMOVE AND REPLACE FLOORING IN LIVING ROOM, KITCHEN, ENTRY, AND HALLWAY OF CONDO UNIT #2101. REMOVE CARPETING (LIVING ROOM & HALLWAY), LINOLEUM (KITCHEN), AND TILE (ENTRYWAY) TO INSTALL NEW VINYL FLOORING. FIRE RESISTANCE Where removal of flooring e
(DMH - ProjectDox) CONSTRUCT 6-STORY, PODIUM STYLE, 40 UNIT RESIDENTIAL APARTMENT BUILDING TO EXISTING 3-STORY RESIDENTIAL BLDG. Const type: III-B over I-A Occupancy: R-2/ B 2020 MSBC Certificate of Occupancy required: YES. See
T.I. SUITE 1700-Interior tenant renovation certificate of occupancy required: no const type: occupancy: 2020 MSBC occupant load: 48 sprinklered: yes Tenant: Jakks Floor(s): 17 sac: _NA_ charges __ credits = __