Minneapolis, MN
Minneapolis, MN
470
4
$2,793,250
1
FIXTURES FOR GRAY FOX COFFEE - NEW HAND SINK, REPLACEMENT ELECTRIC WATER HEATER, DIPPER WELL, 2 INDIRECT DRAINS.
WINDOW REPLACEMENT This permit authorizes the removal and installation of 2 glass patio doors. (sza) 1. For one- or two-family dwellings, windows installed under this permit shall meet the requirements of the current Minnesota State Residential Cod
COFFE SHOP REMODEL (MAA) certificate of occupancy required: N0 const type: I A occupancy: B 2020 MSBC occupant load: LESS THAN 50 sprinklered: YES Tenant: GRAY FOX Floor(s): sac: __0 charges _0_ credits = _0
Installing new gas piping to feed existing RTU and new RTU. Refer to attached plans.
interior demo of suite 215.
RESURFACE REAR AREA ROOFTOP DECK certificate of occupancy required: no special inspections required yes Guards shall be located along the open sides of stairs, ramps, and landings that are located more than 30 inches measured vertically to the
Add (1) 12" hand sink. Tie-into existing piping in wall.
REPLACE HYDRONIC FAN COIL
replace 2 sliding glass doors in unit 1804.
NON STRUCTURAL INTERIOR REMODEL OF UNIT 2301 (MAA) MAINTAIN FIRE AND SOUND SEPARATION TO MATCH EXSITING ARCHITECT: KEN PIPER 23542
certificate of occupancy required: no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required: no const type: occupancy: B 2020 MSBC oc
SEAL OFF AND COVER EXISTING 36'x12' COAL CHUTE VAULT AT REAR OF APARTMENT BUILDING. INFILL 3 OPENINGS IN WEST FOUNDTION WALL, AND CONSTRUCT NEW 8'x12' STOOP CENTERED ON EXISTING EXTERIOR DOOR AT REAR OF BUILDING (6 STORY APARTMENT BUILDING - BUCKINGHAM AP
Replacement of failed and failing rain leaders.
Demo old Central Electric Fan coil and install New
Install (1) 200 CFM ERV with humidistat and duct in basement mech/storage. Reuse existing fresh air & Exhaust hoods/louvers.
METER MOVE Q4 - 2021 BATCH #27
Ramp Repairs certificate of occupancy required: no special inspections required: yes occupancy: S2 2020 MSBC engineer: Steven Talafous #19938
gas piping for gas fired generator
dishwasher
Add disposal under kitchen sink, install new toilet, install new shower handle, valve, head and tile drain in approximately the same location as existing. Install new vanity faucet and connect sink
(DMH - ProjectDox) CHANGE OUT BATHTUB WITH NEW SHOWER STALL IN CONDO UNIT #2101. BACKSPLASH TILE WORK AT KITCHEN. REPLACE FLOORING. CEMENT, FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS SHALL BE USED AS BACKERS FOR WALL TILE IN BATHTUB/SHOWER LOCATIONS P
DISHWASHER
INSTALL PLUMBING FOR (1) TOILET AND (1) LAV
Demo existing shower. Install new shower pan, and surround walls. Installl new posi temp valve with stops. Hook drain into existing drain and bring up to code if necessary.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.