Minneapolis, MN
Minneapolis, MN
470
4
$2,793,250
1
2 fire rated Bath fans, Units 103 and 107
Commercial partners Title/interior improvements #2100 certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: yes Tenant: Commercial Tile Flo
replace gas dryer
Install two (2) new Lochinvar copper fin CWN399 domestic water boilers.
Combining and replacing the steam condensate tank
UNIT 302. KITCHEN AND BATHROOM REMODEL. NO STRUCTURAL WORK. (JJL)
Kitchen & Bathroom Remodel WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO THEM IN THE SAME BUILDING SHALL BE CONSTRUCTED AS FIRE PARTITIONS IN ACCORDANCE WITH BUILDING CODE S
DEMO ONLY - 4TH FLOOR const type: IA occupancy: B 2020 MSBC architect: Hustad, Mary B - 17408 engineer:
New VAV for storage room. There are no unprotected openings for mechanical allowed under this permit. Any transfers ducts need must be ducted solid to main return air duct. .
Complete loading dock and 2nd floor plumbing drain repairs - remove and replace 15-20' of 6" cast iron drain piping and 15-20' of 4" cast iron drain piping.
(DMH-ProjectDox) REMOVE AND REPLACE PATIO DOOR IN EXISTING OPEN IN CONDO UNIT #1203. NO PLAN. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDITIONING/VENTILATION WORK. IT IS THE RESPONSIBILITY OF THE PERMIT APPLICANT T
Hallway & Classrooms Remodel - Building A certificate of occupancy required: no special inspections required: no occupancy: E 2020 MSBC sprinklered: yes architect: Steven Kovalik #42189
level 2 bathroom remodel.
Replace existing 3" gate valves on either side of the main water meter with 3" ball valves
Exhaust and supply for new bathroom connecting to existing mains.
GRDs and all associated ductwork. Refer to attached drawings.
REPLACE ALL BALCONIE RAILINGS TO BRING UP TO CODE (MAA) ENGR : JONATHON SCHWEGEL 59332
FOR 2ND FLOOR - 3 SINGLE RESTROOMS: New waste & vent piping and water piping for (3) separate single bathrooms. Connecting to existing building waste & vent and water piping. Each bathroom includes one new floor drain, one new lavatory, and one new toil
parking ramp concrete repairs and waterproofing. engineer: BCG
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.