Minneapolis, MN
Minneapolis, MN
470
4
$2,793,250
1
REPLACE DISHWASHER
RE-ROOF. (JJL) SCOPE OF WORK: *Tear Off existing EPDM Roof System (1" Coverboard) - Building is structurally sloped *Mechanically attached (2) layers of 2" ISO - Meets R-30 with the insulation in the cavity. *Fully adhere (1) Layer of EPDM membrane
RE-ROOF. (JJL) SCOPE OF WORK: *Tear Off existing EPDM Roof System (1" Coverboard) - Building is structurally sloped *Mechanically attached (2) layers of 2" ISO - Meets R-30 with the insulation in the cavity. *Fully adhere (1) Layer of EPDM membrane t
Rework branch ducts for tenant changes, adding 1 new FPVAV for offices and, adding 1 new heatpump for server room. Heat pump must be provided with proper access. The drawing shows sheetrock ceiling below H.P. however keynote 1 is stating acoustical ceilin
remodel 9 classrooms and hallway on 2nd floor east wing. certificate of occupancy required no sprinklered: yes architect: may
not food and beverage - no plumbing plan review required - 2025-03-18 - lea
Tenant Improvement - Suite 1290 - Russell Reynolds Associates certificate of occupancy required: no special inspections required: no const type: II-A (assumed) occupancy: B 2020 MSBC occupant load: 22 sprinklered: yes
BLDG1105427
#1250 - KITCHEN & BREAKROOM FIXTURES - Replace existing sinks and faucets per plans - one in kitchen and one in secondary breakroom
T/I SUITE 1250 const type: occupancy: B 2020 MSBC occupant load: 191 sac: _4.54_ charges _5.01_ credits = _-0.47_ net met council letter dated _12/31/24_ architect: 17408 - Hustad, Mary B
Reroof - EPDM General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Section 1504, the fire classification of Section 1505 and the material requirements as specified in sect
#908. REPLACE (2) PATIO DOORS. NO CHANGE TO ROUGH OPENING RO STRUCTURAL WORK. (JJL)
Replace dishwasher
(DMH-ProjectDox) REMOVE & REPLACE FRONT FACING WINDOW IN SAME OPENING IN GRADE LEVEL APT UNIT. APPROVED PLANS ANDPERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIRED TO PRINT COPIES OFELECTRONIC APPROVED PLANS AND DOCUMEN
gas firepit. gas line by others
Replace steam pressure regulating valves
Install plumbing Fixtures in 1st Floor
(DMH-ProjectDox) REPLACE TUB LOCATION WITH NEW SHOWER STALL. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATIONS. IN MULTI-UNIT BUILDINGS, COMMON PARTY WALLS MUST USE SAME OR EQUIVALENT MATE
Shower installation
Replace Dishwasher
NEW STOREFRONT STOOP AND ENTRY, NEW GARAGE DOR (MAA) certificate of occupancy required: yes no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required: yes no
WINDOW REPLACEMENT This permit authorizes the removal and installation of 80 windows. (sza) 1. For one- or two-family dwellings, windows installed under this permit shall meet the requirements of the current Minnesota State Residential Code. 2. F
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.