Minneapolis, MN
Minneapolis, MN
470
4
$2,793,250
Fire/Water Damage Repairs - Units 407 & 507 occupancy: R-2 2020 MSBC WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO THEM IN THE SAME BUILDING SHALL BE CONSTRUCTED AS
Suite 920/New plumbing-sink, fridge, coffee, dishwasher
Office suite tenant improvement -ACW certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occupant load: 55 sprinklered: yes energy code chapter used: 9.
T/I SUITE 200 const type: IA occupancy: B 2020 MSBC occupant load: 71 sprinklered: YES sac: _1.97_ charges _1.94_ credits = _0.03_ net met council letter dated _09/05/2025_ architect: 17408 - Hustad, Mary B @ NELS
Interior renovation of existing office space #200 certificate of occupancy required: no const type: 1 2020 MSBC sprinklered: yes architect: ewert Ewert Studio SAC: 0 charges, MCES letter dated 9/2/25
greiner office. office breakroom sink
HVAC alterations include modifying the existing distribution system through the current air handling units, reusing existing VAV boxes to suit the new floor layout, GRDs, and all associated ductwork as per the approved plans.
Tenant Improvement in existing building -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occupant load: 48 sprinklered: yes Floor(s): 30 + 3
(DMH-ProjectDox) Stucco 4 sides over existing CMU/brick of chimney stack (install self-furring metal lath with corner bead). Spot tuckpointing and replace 250 brick at rear (West side) of Apt building. (Photos provided). ISSUANCE OF THIS PERMIT SH
REPAIR CHIMNEY 2020 MSBC
TENANT IMPROVEMENT. SUITE 2075. (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occupant load: 45 sprinklered: yes 20% accessibility upgrades___NEW
Gas piping to RTUs. Gas piping only. RTU equipment to be installed by Allen Mechanical under a separate permit.
(1) diffusers and transfer grill - Suite 1250 for 4th floor vending remodel. No mechanical plans to view. Lifesafety plans are located in the for reference only file within the drawings folder. The life safety plans identify the vending room wall parallel
install 1 hr rated suspended ceiling grid in parking garage.
REMODEL SECURITY DESK const type: IA occupancy: B 2020 MSBC sprinklered: YES architect: 20507 - Helland, Terrell Lee @ RSP
SUITE 1040. REMOVING INTERIOR WALL. SOME ELECTRICAL IN WALL. NEW FINISHES. (JJL)
(DMH-Pdox) OFFICE DEMO ONLY. SUITE 200. - 2020 MNSBC APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIRED TO PRINT COPIES OF ELECTRONIC APPROVED PLANS AND DOCUMENTS FROM PROJECTDOX AND HAVE A HARD C
Relocating diffusers per approved plan.
Interior remodel to combine two existing office suites on 16th floor -ACW certificate of occupancy required: yes special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 89 sprinklered: yes
T/I SUITE 400 - ADD VENDING ROOM const type: IA occupancy: B 2020 MSBC architect: 20507 - Helland, Terrell Lee
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.