Minneapolis, MN
Minneapolis, MN
470
4
$2,793,250
LOWER LEVEL INTERIOR REFINISH AT TERRENCE MURPHY HALL AT UNIVERSITY OF ST THOMAS ALTER DOOR LOCATION AT COORDINATOR OFFICE AND ADJACENT STORAGE SPACE. certificate of occupancy required : no const type: I-B occupancy: B 2015 MSBC
Break Room for Suite 2125 on 21st Floor. Food Ok.
TENANT IMPROVEMENTS IN SUITE 2125 (KAS#1) DEMO EXISTING PARTITION WALLS FOR NEW certificate of occupancy required no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspectio
INTERIOR REMODEL OF EXISTING STARBUCKS RESTAURANT ON MAIN FLOOR OF DOUBLE TREE HOTEL. AAJ#1 ***NOTE: THIS PERMIT IS AN ADDITIONAL PERMIT TO PERMIT # BLDG645817*** certificate of occupancy required: NO mechanical plans required for certificate of
FOR #303 - KITCHEN & BATHROOMS - 2 BASINS, 2 SHOWERS, SINK AND DISHWASHER
kitchen sink and elec water heater unit#1725
alterations on first floor and 2nd floor rooms 214, 216, and 218 - existing hotel building. sck#1 painting, wall coverings, carpet and furniture on all other floors does not require permit. certificate of occupancy required no sprinklered: yes
INSTALL A LOW WATER CUTOFF WITH MANUAL RESET, (1) BOILER ROOM E-STOP AS WELL AS A NEW COMBUSTION AIR LOUVER AS REQUIRED PER CODE
RECONFIGURE EXISTING OFFICE SPACE (WSS) SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 IRC 313.2.1. When interior alterations
REPAIR CONCRETE FLOORS OF PARKING RAMP, FLOOR 2, 2.5, 3.5 ENGINEER OF RECORD TO PROVIDE ALL SPECIAL INSPECTIONS AND PROVIDE A LETTER OF COMPLIANCE TO THE CITY UPON COMPLETION. certificate of occupancy required no special inspections required yesS co
NEW engineered FLOORING CABINETS FIXTURES AND PAINT (kas) finishes only QUIET WALK UNDERLAYMENT SOUND/FIRE TEST ASSEMBLY___IIC 50 STC___54__ SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK.
PARKING GARAGE REPAIRS - STRUCTURAL AND WATERPROOFING - AT LASALLE COURT PARKING RAMP PER ENGINEER'S REPORT. (LAH) SPECIAL INSPECTIONS REQUIRED. ENGINEER: LEWIS NG 16929 (BUILDINGS CONSULTING GROUP, INC.)
106 fixtures and water heater
bathroom remodel of Unit #1304. BATHROOM REMODEL OF UNIT #1304 OF EXISTING APARTMENT BUILDING. AAJ#2. certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\
1ST FLOOR FITNESS CENTER - connect existing bldg. supply to fan coil units - provide indirect MUA unit @ 250mbh for locker room exhaust and toilet exhaust - provide distribution ductwork per engineered plans
Ste 209 - duct alterations to accommodate new office layout
1st floor el.wtr htr 6 floor drains 10 lavs 8 showers breakroom sink 1 standpipe 4 urinals 1 water cooler
remove escalators and replace with fixed stairs between first and second floors in lobby. sck#1 existing draft curtains to remain.
2 toilets 2 showers 2 bath sinks 1 kitchen sink 2 toilets 2 showers 2 bath sinks 1 kitchen sink
Replace (7) VAV boxes and ductwork. new diffusers per engineered drawings OPUS HALL(LEVEL 2), TERRENCE MURPHY (LEVEL 3 REMODEL FLOOR PLAN ) & LEVEL 3 REMODEL FLOOR PLAN
Demo Only-basement first and second SELECT WALL DEMO ONLY AT BASEMENT LEVEL WITH REMOVAL OF ESCALATORS AT BASEMENT, 1ST & 2ND FLOOR. ADDITIIONAL PERMITS AND (DMH#1) APPROVALS BY ESCALATOR CONTRACTOR REQUIRED. CONTACT STEVE GOEMER IF QUESTIONS 612-67
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.