Minneapolis, MN
Minneapolis, MN
470
4
$2,793,250
13 FIXTURES FOR 17TH FLOOR RESTROOM
TENTANT BUILD OUT OF NEW FOOD CART TENANT; STORAGE AND PREP KITCHEN AT SUITE # 005 (MAA) certificate of occupancy required YES const type: 1-A occupancy: F-1 2015 MSBC occupant load: 6 sprinklered: YES 20% accessibility upgrades_
repair left corner of mud leg Kewanee boiler.
2 EXISTING BATHROOMS BEING REMODELED. NO CHANGES TO PLUMBING THIS AREA. NEW FIXTURES, FLOOR, FINISHES. KITCHEN GETTING NEW CABINETS, FLOORING, FINISHES. FLOORS WERE TILE, AND WILL BE TILE AGAIN. NEW SOUND MAT UNDER FLOOR. MOVING SINK FOR WET BAR. 18
Concrete parking ramp repair ENGINEER: Building Consulting Croup - Lewis NG #16929
SUITE 208-SINK
kitchen sink unit # 403
INSTALL NEW HARDWOOD FLOORING UNDERLAYMENT - Pergo Gold Premium IIC rating 71
IN COMMON AREA OF CONDO BUILDING - INSTALL NEW WASTE AND VENT PIPING FOR 2 EXISTING WASHING MACHINES
NEW DUCTS & DIFFUSERS PER PLANS FOR SUITE #2350
EXTEND DUCTS THRU SPACE ADD NEW DIFFUSERS FOR SUITE #208
17TH FLOOR RESTROOMS - DIFFUSER & DUCTING ALTS
remodel bathrooms and corridor finishes on 17th floor base building. sck#1 certificate of occupancy required no architect: sutton
REMODEL 11,400 SQ.FT. OFFICE SPACE SUITE 2350. NO CHANGES TO EXISTING DEMISING WALLS OR CORRIDOR. EXISTING ELEVATOR LOBBY. SEPARATE PERMIT FOR DEMO WORK. (DMH#1) NEW PARTITION WALLS FOR SMALL OFFICES, CONFERENCE ROOMS, AND EMPLOYEE CAFE AREA. C
DEMO WORK IN SUITE # 005 (JAG) DEMO MINOR WALLS FOR FUTURE KITCHEN RELOCATION TO NEW LOCATION. FUTURE WORK UNDER SEPARATE PERMIT APPLICATION. MAINTAIN REQUIRED FIRE SAFETY PUBLIC PROTECTIONS. ARCHITECT: DJR, SCOTT NELSON # 17444 PLANDS DATED 2-6-18
Relocate 3 TON A/C Condensing Unit serving kitchen freezer
Interior remodel suite 2200 - mothers room certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 105 sprinklered: yes Tenant: Zeller Realty Group Flo
Install plumbing for a breakroom sink #1640
Install plumbing for a breakroom sink #1210
Install plumbing for a breakroom sink #1620
Install plumbing for a mother's room sink 22nd fl
RE-ARRANGE DUCTS & DIFFUSERS FOR 12TH FLOOR
REMODEL SUITE 1640 - ZELLAR REALTY SUITE 1640. OFFICE FRAMING. NEW RECEPTION DESK AND CONFERENCE ROOM. SMALL BREAKROOM WITH SINK INCLUDED. UPDATED FINISHES. (JJL) certificate of occupancy required no special inspections required no const typ
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.