Minneapolis, MN
Minneapolis, MN
470
4
$2,793,250
INFILL STAIRWAY OPENING ABOVE SUITE 1900 const type:IA occupancy: B 2020 MSBC sprinklered: yes architect: 23558 - Walz, Jeffrey Lee @ GENSLER engineer: 44681 - Thomas, Matthew Earl @ MBJ
Scope includes: 1st through 12th floor remodel (tub to shower conversion, install shower pans, install final trims, install ADA tubs, install ADA sinks, install faucets.) Also replacing 4 of the main water stack main water supply stacks. All plumbing
Tenant Improvement - Suite 214 - Confetti Blossom Candies certificate of occupancy required: no special inspections required: no occupancy: M 2020 MSBC sprinklered: yes sac: 0.17 charges 2.15 credits = -1.98 net met council l
#1010 install electric water heater in break room
REMODEL - DOUBLETREE SUITES NO ALTERATION/RECONFIGURATION TO EXITING/EGRESS 2020 MSBC
HCAC system, utilizing existing heat pumps system installing makeup air unit, exhaust fans, gas line, GRDs and all associated ductworks per approved plans.
Take out tub & install walk tub in same location
bathroom remodel unit 1102.
LEVEL 18. INTERIOR DEMO ONLY. NO CONSTRUCTION. NO CHANGE TO EXITING OR RESTROOMS. (JJL) ARCHITECT: BDH - JOLENE SANTEMA #59613
Plumbing for a restaurant remodel. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps, fixtures, material, and devices used in the plumbing system shall c
parcelle- existing tenant space for new restaurant (MAA) CONST TYPE: I A NUMBER OF STORIES: OCCUPANCY: A2 2020 MSBC OCCUPANT LOAD: 71 SPRINKLERED: YES BUILDING NAME/TENANT: PARCELL @ LASSALE PLAZA SAC: _6.97_CHARGES
Remodel office suite 1010, sink/water to fridge
Rehang diffuser for breakroom 1002, lobby 1000, and add 1 egg create to office 1004, 1006. 1010. Suite 1010 Mechanical permit BLDG1154495 AN-1 Life Safety.pdf
Suite 825 Revise diffuser locations on (4) VAVs and (3) FPV Work includes relocating VAV's and t-stats. BLDG1154363
Plumbing for new spec suite. Install of (1) sink.
T/I SUITE 825 const type: IA occupancy: B 2020 MSBC occupant load: 54 sprinklered: YES energy code chapter used: ASHRAE 90.1-2019 architect: 63594 - Benner, Stacy Lynn @ NELSON
remodel 2,500 sq ft of office space suite 1010. 2500 sq ft certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: _0_ charges __ met council letter dated _10/30/25_
remodel office suite 875. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: _0_ charges __ met council letter dated _8/29/25_ architect: Nelson Architects
Replace Dishwasher Apt 2001
remodel office suite 970. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes architect:
BLDG1150163 OFFICE REMODEL: New branch ducts in office 206 and 208 and 2 new duct mounted diffusers in 207. 3 new air transfer ducts are also added to office 206,207,208. Additionally, 5 eggcrate for return air are being added to office 213-216 and 6 ne
Bathroom remodel x2 - tub to shower conversion, shower to shower direct replacement - Unit 2008 occupancy: R-2 2020 MSBC WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS T
Bathroom remodel x2 - tub to shower conversion, shower to shower direct repalcement.
Reroof - Slate Shingles, Copper Flashing | Carriage House - Asphalt Shingles Slate shingle installation shall meet all requirements of MSBC Sections 1504.1.1 and 1507.7 Asphalt shingle installation shall meet all requirements of MSBC Sections 1504.1.1 an
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.