121 7TH PLACE E, Saint Paul
METRO SQUARE ESCALATOR REPLACEMENT PROJECT DEMOLITION AND REMOVAL OF ESCALATOR SYSTEM. INSTALL NEW STAIRS AND FINISHES PER PLANS AND SPECIFICATION.
121 7TH PLACE E, Saint Paul
Other-See Comments. METRO SQUARE CURTAINWALL PROJECT REMOVE EXISTING CURTAINWALL. APPLY NEW AIR BARRIER, INSTALL NEW INSULATION AND GYP SHEATHING. REINSTALL EXISTING CURTAINWALL WITH NEW HARDWARE AS REQUIRED.
187 7TH PLACE E, Saint Paul
ATLAS STAFFING -- VANILLA SHELL -- FUTURE TENANT BUILD-OUT REQUIRES SEPARATE PLANS AND PERMITS EXISTING TYPE V-B 3-STORY BUILDING - CURRENTLY EMPTY. RENOVATE INTO BUSINESS OCCUPANCY USED BY ONE TENANT. PROVIDE 2ND STAIRWAY. PROVIDE HVAC, ELECTRICAL, AND PLUMBING UNDER SEPARATE DESIGN-BUILD BY GENERAL CONTRACTOR.
189 7TH PLACE E, Saint Paul
Re-roofing upper eastern roof on building (main higher roof). Removal of existing roofing. Installing 1/2" high density wood fiberboard, mechanically fastened, 60 mil rubber membrane, Fully Adhered roof system with accessories along with metal cap and edge metal.
121 7TH PLACE E, Saint Paul
REMOVE AND REPLACE EPDM 10 SQ TEAR OFF BUILT UP ROOF, INSTALL 1/2" DENS DECK MECHANICALLY ATTACH, 2.5" ISOCYANURATE, TAPER AND SADDLE
1 7TH PLACE W, Saint Paul
REMODELING
17 7TH PLACE W, Saint Paul
Other-See Comments. MURAL PANELS - PUBLIC ART
121 7TH PLACE E, Saint Paul
Other-See Comments. METRO SQUARE BUILDING COMPLETE RE-ROOF OF METRO SQUARE BUILDING. TEARING OFF EXISTING BUILT-UP-ROOF TO THE DECK AND INSTALLING A NEW F.A. EPDM SYSTEM
33 7TH PLACE W, Saint Paul
INTERIOR SPACE DEMOLITION OF THE FORMER WILD TYMES RESTAURANT SPACE IN PREPARATION OF A NEW BUILD-OUT.
121 7TH PLACE E, Saint Paul
NEW OFFICE ON 1ST FLOOR PER PLANS - SOUTH WEST CORNER
85 7TH PLACE E, Saint Paul
LEASE HOLD IMPROVEMENT
85 7TH PLACE E, Saint Paul
GENERAL IMPROVEMENTS TO THE GOLDEN RULE BUILDING FOR THE CONNECTION TO THE 428 MINNESOTA ST PROJECT, INCLUDING THE ADDITION OF A LOUVER ON THE 7TH PLACE SIDE
121 7TH PLACE E, Saint Paul
METRO SQUARE BUILDING- OFFICES REMODEL PER PLANS & SPECS
121 7TH PLACE E, Saint Paul
METRO SQUARE ATTORNEYS - OFFICE REMODEL 4th & 5th Floors
121 7TH PLACE E, Saint Paul
RAMSEY COUNTY GOVERNMENT CENTER - INTERIOR REMODEL PER PLANS & SPECS
85 7TH PLACE E, Saint Paul
Tear off existing roof, Install EPDM roofing system
85 7TH PLACE E, Saint Paul
SUITE #280 LEASE HOLD IMPROVEMENT.
9 7TH PLACE W, Saint Paul
Stair/Landing Rebuild. 7TH PLACE RESIDENCE- DUMPSTER PAD & STEP REPLACEMENT- BACK OF BUILDING/ALLEY
121 7TH PLACE E, Saint Paul
RAMSEY COUNTY GOVERNMENT CENTER- INTERIOR REMODEL
17 7TH PLACE W, Saint Paul
BAR EQUIPMENT ROUGH-IN AND CONNECTION.
17 7TH PLACE W, Saint Paul
PALACE THEATRE FINISHES
17 7TH PLACE W, Saint Paul
CONCRETE FLOOR, BLOCK WALLS, MEP ADDED TO BUILDING ELEVATOR.
17 7TH PLACE W, Saint Paul
REPAIR DAMAGED/RUSTED BEAMS WITH NEW STRUCTURAL STEEL IN THE BASEMENT AT UNDER THE ENTRANCE
5 7TH PLACE W, Saint Paul
Dori Permit application and two sets of plans with Dori Need SAC determination - Received 11-16-15 Spoke with architect Peter Kramer regarding additional information needed. Also sent email to Jamey Flannery. 11-10-15 Received additional info 11-12-15
17 7TH PLACE W, Saint Paul
Jim B REMODEL 1916 THEATER STRUCTURAL REPAIRS AND ENCLOSURE REPAIRS FOR CONVERTING MOVIE THEATRE TO A 3,000 CAPACITY MUSIC VENUE: This building permit will cover the enclosure, (exterior masonry and roof), and the structural reinforcement inside the Palace as outlined in the structural drawings approved by Brian Karpen. No structural work will be done between grids K and M (the south alley) until further testing of the existing columns has taken place and been approved by DSI (Brian Karpen and Seve Ubl).