Timeline
ApprovedNov 6, 2024
IssuedNov 6, 2024
Inspection record
Inspections104
Passed55
Failed0
  1. Apr 9, 2026·9:00 AM - 11:00 AM

    Commercial Final

    scheduled

    InspectorBrian Stemwedel

  2. Apr 6, 2026

    Commercial Final

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    all 3rd floor units N. of firewall. Window opening limiters were NOT installed. need to limit openings to <4" where sill is >72" from grade
  3. Mar 3, 2026

    Commercial Final

    SEE COMMENTS

    InspectorBrian Stemwedel

    at mechanical inspection, noted fire doors protecting elevator lobby doors are required to have listed H gaskets installed. (verify at final) additionally, there is a clearance issue with the bottom of the door and the tile in the elevator lobby. contractor proposed cutting down the bottom of the fire door for clearance (includes bottom latch) told contractor that any modifications to door would need to be approved by the listing agency (Intertek) [NFPA 80] follow up on this
  4. Jan 28, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorBrian Stemwedel

    looked at transition to deck from interior FF elevation (looked at worst condition) Contractor made every attempt to meet accessibility requirement given elevation diff. told contractor that proposed threshhold condition would be acceptable with mini 'ramp'
  5. Jan 7, 2026

    Commercial Framing

    APPROVED

    InspectorBrian Stemwedel

    met with Steve on site to discuss Accessibility requirements particularly at grade level entry doors. All framing complete
  6. Jan 7, 2026

    House Wrap/Lathing

    APPROVED

    InspectorBrian Stemwedel

    remaining lath for cultured stone (exterior)
  7. Jan 7, 2026

    Commercial Footing

    APPROVED

    InspectorBrian Stemwedel

    All footings complete
  8. Dec 30, 2025

    Commercial Wallboard

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    at elevators/ trash chutes- OK to install final layer of gyp. framing between shaft/ interior ISCWAP
  9. Dec 23, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Looked at interior framing at shaft wall in elevator B. All penetrations still need to be firestopped. told contrctor to take pictures and could frame in 2nd wall in front of shaft concealing elevator door mechanism. also verified shaft integrity and separation between trash chute shaft and adjacent mechanical shaft .
  10. Dec 11, 2025

    Commercial Wallboard

    APPROVED

    InspectorBrian Stemwedel

    Level 1 Shear walls. plywood/ gyp nail schedule
  11. Nov 20, 2025

    Meet Contractor

    SEE COMMENTS

    InspectorBrian Stemwedel

    fireblocking identified on 11/19 in level -01 started and approved. need to finish in corridor prior to concealing
  12. Nov 19, 2025

    House Wrap/Lathing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    screened in porch on west elevation: Level -1, 1
  13. Nov 19, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Level -1 *** Fireblocking required at floorline at framed wall against CMU firewall. verify before concealing. Noted lid of corridor level -1, FG batt in joist cavities
  14. Nov 12, 2025

    Commercial Framing

    NOT APPROVED

    InspectorBrian Stemwedel

    3 hour firewall penetration with pvc dwv. Units 015 and 017 NEED 3 hour detail for through penetrations of firewall
  15. Nov 10, 2025

    Commercial Wallboard

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    shear wall details on 1st floor phase II
  16. Nov 6, 2025

    Commercial Wallboard

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    2nd floor shear walls phase 1, 2, and 3
  17. Nov 4, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    unit framing :101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113
  18. Nov 4, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    ex wall FG batt and VB Units: 121, 123, 124, 125, 126,127, 128, 129, 130, 132, 133, 134, 135, 136, 138, 174
  19. Oct 28, 2025

    Commercial Wallboard

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    verified GYP behind FD frames as required on 1st and 2nd floors. gyp extends to firewall liner as required
  20. Oct 27, 2025

    House Wrap/Lathing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    North facing wall of south courtyard, prepped for scratch coat
  21. Oct 27, 2025

    Commercial Wallboard

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    2nd floor phase 3. Shear walls
  22. Oct 23, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Unit framing: 117, 121, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, and 138
  23. Oct 22, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Lids blown in FG Units: 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 211, 212, and 213
  24. Oct 20, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    SPF in rims, Ex. wall FG batt w/ VB Units: 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 211, 212, and 213
  25. Oct 16, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Unit framing: Units 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 211, 212, and 213
Show 79 earlier inspections
  1. Oct 15, 2025

    House Wrap/Lathing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    NE wall above entry, lath approved and ok to apply scratch coat
  2. Oct 15, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Lids (Blown) Units: 214, 215, 216, 217, 218, 219, 220, 221, 222, 223, 224, 226, and Library
  3. Oct 14, 2025

    Commercial Wallboard

    CORRECTION NOTICE

    InspectorBrian Stemwedel

    gyp does not extend behind fire door frame (3rd floor) remove frame and install gyp per NFPA 80 and approved details on plans
  4. Oct 13, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Ex wall insualtion w/ VB Units: 214, 215, 216, 217, 218, 219, 220, 221, 222, 223, 224, 226, 228, and library
  5. Oct 9, 2025

    Commercial Framing

    CALL FOR REINSPECTION

    InspectorBrian Stemwedel

    Need to verify door detail at firewall, at time of unit framing inspection, it was noted 5/8" gyp on corridor walls did not extend under frame each side (only partial coverage)
  6. Oct 9, 2025

    House Wrap/Lathing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Lath and underlayment for cultured stone adjacent N courtyard @ 38 stack
  7. Oct 8, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Insulation in Ex. walls, demising walls, lids. Units 225, 227, 228, 229, 230, 231, 232, 233, 234, 235, 236, 237, and 238
  8. Oct 7, 2025

    Meet Contractor

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Looked at reinforcement for in ground pool (Shotcrete) all rebar ISCWAP does not include hot tub area (constructed after pool (connected) is complete and common pool wall stripped on hot tub side
  9. Oct 6, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    SPF @ rims. OK to net lids Units 225, 227, 228, 229, 230, 231, 232, 233, 234, 235, 236, 237, 238
  10. Oct 2, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    *** Note: missing blocking for ADA Type B in all units, spoke to Steve, Steve said they would be removing pre rock to install blocking. will monitor progress on future inspections. Unit framing: Units 225, 227, 228, 229, 230, 231, 232, 233, 234, 235, 236, 237, 238 -ok to insulate with understanding ADA blocking needs to be verified prior to concealing
  11. Sep 30, 2025

    Commercial Framing

    NOT READY

    InspectorBrian Stemwedel

    no units ready for inspection at scheduled time
  12. Sep 29, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Unit insulation exterior walls FG batt and VB, interior demising walls Noted at unit demising walls, in roof/ ceiling assembly over fire partitions, they need to draftstop areas into volumes less than 160 cu. ft. Units: 301, 302, 303, 305, 306, 307, 308, 309, 310, 311, 312, and 313
  13. Sep 26, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorDale Gronberg

    * 11 - 3rd floor lids as marked on door cards. One was not ready
  14. Sep 25, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Unit framing, Noted at unit demising walls, in roof/ ceiling assembly over fire partitions, they need to draftstop areas into volumes less than 160 cu. ft. Units: 301, 302, 303, 305, 306, 307, 308, 309, 310, 311, 312, and 313
  15. Sep 24, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    exterior unit walls with VB and interior demising walls Units: 316, 317, 318, 319, 320, 321, 322, 323, 324, and 326
  16. Sep 23, 2025

    Commercial Framing

    NOT READY

    InspectorBrian Stemwedel

  17. Sep 22, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    SPF insulation in rims and roof drains and leaders (where present) Unit(s): 316, 317, 318, 319, 320, 321, 322, 323, 324, and 326
  18. Sep 19, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    unit framing, no shear walls. verified Aluminum clips @ fire wall. Units 314, 315, 316, 317, 318, 319, 320, 321, 322, 323, 324, and 326
  19. Sep 18, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    3RD FLOOR PHASE 1 CEILING ROCK SHOWING 18" OFFSET BETWEEN 1ST AND 2ND LAYER
  20. Sep 17, 2025

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

    VIEWED FIXES FOR DAMAGED STRUCTURAL MEMBERS, UPLOADED TO PROJECTDOX MISSING FIRE CLIPS ON MIDDLE FIREWALL
  21. Sep 16, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Unit wall insulation, exterior wall insulation (FG Batt w/ VB) (11 units) Units 325, 327, 328, 329, 330, 331, 333, 334, 335, 336, 338
  22. Sep 15, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorChris Weaver

    3RD FLOOR, NORTH END, PREROCK INSPECTION, INSULATION IN SOFFITS
  23. Sep 12, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorMarshall Lind

    SHEAR WALL TOP FLOOR WEST END, Units 333, 332, 327, Unit 333 need to cut off rods and fix fire blocking or fire caulk penetration. STAIRWAY C pre-rock, NEED FIRE BLOCKING ON TOP LEVEL, NEED FIRE CAULK BETWEEN FLOOR 2 & 3 ELECTRICAL WIRE
  24. Sep 11, 2025

    Commercial Wallboard

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Building B: South Elevator Shaft 3rd floor, 1st layer- screw patterns ok Building A: 'Center' Elevator Shaft 3rd floor, 1st layer- screw patterns ok Center mechanical shaft, 3rd floor, 1st layer Trash Chute, 3rd floor, 1st layer N. Mechanical Shaft, 3rd floor, 1st layer
  25. Aug 29, 2025

    Commercial Insulation

    CANCELLED APPOINTMENT

    InspectorDale Gronberg

  26. Aug 28, 2025

    Commercial Insulation

    SEE COMMENTS

    InspectorChris Weaver

    INSULATION PROGRESS CHECK
  27. Aug 27, 2025

    Commercial Insulation

    SEE COMMENTS

    InspectorChris Weaver

    DISCUSSED SPRINKLER BOXES, INLINE FAN IN LOCKER ROOMS, AND SHAFT SEPARATION WITH VENTILATION AND GARBAGE CHUTES
  28. Aug 26, 2025

    Commercial Insulation

    SEE COMMENTS

    InspectorChris Weaver

    PROGRESS CHECK ON ROOF MECHANICAL SHAFT WITH 4" SPRINKLER LINE NOT BIG ENOUGH FOR CONNECTION BOX, LOOKING FOR DETAIL OF SOLUTION
  29. Aug 25, 2025

    Commercial Insulation

    SEE COMMENTS

    InspectorChris Weaver

    ROOF INSULATION PROGRESS CHECK OK
  30. Aug 22, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorMarshall Lind

    FOUNDATION, South wall to jog in wall on East side, Marked on plans/ No grid lines
  31. Aug 22, 2025

    Commercial Framing

    NOT READY

    InspectorMarshall Lind

    ROOF INSULATION NOT READY
  32. Aug 20, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorChris Weaver

    PARAPET INSULATION OK
  33. Aug 19, 2025

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorChris Weaver

    PARAPET INSULATION OK LOW ROOF NORTH END 11" OF ISO ON ROOFS FIRST SECTION. WILL BE CALLING DAILY FOR PROGRESS INSPECTIONS
  34. Aug 18, 2025

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  35. Aug 13, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    VIEWED ROOF AND PARAPET INSULATION ON TALL ROOF AND SHORT ROOFS
  36. Aug 11, 2025

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

    OSHA ON SITE VISIT SITE CLOSED
  37. Aug 7, 2025

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  38. Aug 6, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    VIEWED 2ND LAYER SOUTH END MECH AND STAIR SHAFTS
  39. Aug 4, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    VIEWED STAIR AND MECH SHAFT WALLS3RD FLOOR 1ST LAYER SOUTH END
  40. Jul 31, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    3RD FLOOR CENTER SHAFTS 2ND LAYER OK
  41. Jul 30, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    3RD FLOOR MIDDLE ELEVATOR, STAIR, MECH SHAFTS DRYWALL PATTERNS OK
  42. Jul 28, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    3RD FLOOR SHAFT PATERNS
  43. Jul 24, 2025

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  44. Jul 23, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    VIEWED MECH SHAFT ROCK
  45. Jul 21, 2025

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  46. Jul 17, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    2ND LAYER ON SOUTH STAIRS AND ELEVATOR SHAFTS
  47. Jul 16, 2025

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  48. Jul 15, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    1ST LAYER ROCK SOUTH SIDE STAIR TOWER, ELEVATOR AND MECH SHAFT
  49. Jul 14, 2025

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  50. Jul 9, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    VIEWED 2ND FLOOR CENTER MECHANICAL SHAFT
  51. Jul 7, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    2ND LAYER OF ROCK ON EXTERIOR OF SHAFTS ON 2ND FLOOR
  52. Jul 3, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    SOUTH STAIR TOWER EXTERIOR ROCK 1ST LAYER
  53. Jul 2, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    1ST LAYER ROCK ON NORTH STAIR TOWER 2ND FLOOR
  54. Jun 30, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    MORE VISUAL CONFIRMATIONS OF LAYERS OF DRYWALL ON MISC SHAFTS
  55. Jun 26, 2025

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  56. Jun 25, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorChris Weaver

    VIEWED 2ND LAYER OF EXTERNAL SHAFTS
  57. Jun 24, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorChris Weaver

    VIEWED 2ND FLOOR 1ST LAYER OF ROCK ON STAIR TOWERSAND ELEVATOR ALSO VIEWED PATTERNS ON PARTITION WALL SHEAR PATTERNS
  58. Jun 18, 2025

    Commercial Framing

    PARTIAL APPROVAL

    InspectorChris Weaver

    VIEWED 2ND LAYER DRYWALL ON STAIR SHAFTS EXTERIOR STAGGERED
  59. Jun 17, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    VIEWED ALL LOWER LEVEL PARTY WALLS PREROCK RIP AND INSULATION MECHANICAL SHAFTS DRYWALL 2 LAYERS STAGGERED ON ALL BUT 1, WILL REPAIR TIE ROD HOLD DOWNS NOT INSTALLED YET LOWER LEVEL PARTY WALL SHEAR NAIL PATTERS OK
  60. Jun 10, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    CONSULTATION REGARDING INSPECTIONS AND EXPECTATIONS
  61. Jun 3, 2025

    Meet Contractor

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  62. May 16, 2025

    Radon

    APPROVED

    InspectorKevin McDermott

    South side of residential area OK. Small rooms off residential corridor OK.
  63. May 13, 2025

    Radon

    PARTIAL APPROVAL

    InspectorKevin McDermott

    Under slab radon barrier at North half of west side at residential units OK. Sealed at edges. Toilet holes are open for plumber and will need to be sealed after plumbing work.
  64. May 12, 2025

    Commercial Footing

    NOT APPROVED

    InspectorKevin McDermott

    Under slab vapor barrier not done correctly. Also serves as a RADON barrier. Plans show poly going up the stem wall on all sides. Correct and call for re-inspection.
  65. Mar 19, 2025

    Commercial Footing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  66. Mar 18, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorChris Weaver

    PADS 12/J-H, 18-19/J-K POOL FOOTING W/ PADS, POOL HAS TURNED 180 DEG FROM CURRENT PLAN STRIP FOOTING 17-27/J
  67. Mar 17, 2025

    Commercial Footing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  68. Mar 14, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorKevin McDermott

    Strip footing partial along east side. 5 pads. Marked on site plan.
  69. Mar 13, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorKevin McDermott

    12 pad footings and strip footing along north end. Marked on site plan.
  70. Mar 12, 2025

    Commercial Footing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  71. Mar 11, 2025

    Commercial Footing

    APPROVED

    InspectorDale Gronberg

    * 7 1/2" bead board nd 1 1/2 rigidstyro R-30 (OK)
  72. Mar 7, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorKevin McDermott

    15 pads X'd on plan in job trailer.
  73. Mar 4, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorKevin McDermott

    Strip footings: Grid A continuance to north end. 4 interior pads on G and J.
  74. Mar 3, 2025

    Commercial Footing

    CANCELLED APPOINTMENT

    InspectorKevin McDermott

  75. Feb 28, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorKevin McDermott

    Strip footings 1,2,3/ E-A A/ 1-10. Pads D.2/ 7,8,10,11,13. 38 deg
  76. Feb 27, 2025

    Commercial Footing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  77. Feb 26, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorChris Weaver

    F4-6 PADS AT M/4,6,AND 7 & H, I/4 STRIP FOOTINGM/9 THRU G/3 PADS F5-6 AND F6-6 AT GRID F/4, 6, 7, 8, AND 10
  78. Feb 24, 2025

    Commercial Footing

    SEE COMMENTS

    InspectorChris Weaver

    PADS AT GRIDS - ALL F-5-6 AND F6-6 REENFORCEMENT G,J,K / 6,7,8 - K/4 CALLING FOR DEMO PERMIT, LOTS OF CONCRETE RECYCLING HAPPENING APPARENTLY COUNTY WAS ALREADY OUT FOR INSPECTIONS, I REQUESTED REPORT
  79. Feb 18, 2025

    Commercial Footing

    CANCELLED APPOINTMENT

    InspectorDale Gronberg

    * Called contractor due to -15 degree weather. No footings today