Building
16430 Quartz St NW DUP, Ramsey
New, New Dwelling
- Jun 13, 2025
Landscaping Final
PassInspectorChris Anderson
Asphalt d/w in, sod in, 1 tree planted and existing front yard tree satisfies the 2nd tree requirement.
- Jun 3, 2025
Topsoil
PassInspectorJosh Osen
Per email from Josh Osen on 6/3/25; passed
- Mar 28, 2025
Final Building
PassInspectorEric Hoffman
Engineer letter with property file.
- Mar 28, 2025
Framing
PassInspectorEric Hoffman
- Mar 27, 2025
Final Building
Partial PassInspectorEric Hoffman
Corrections from 3/21/25 are completed except 1 item: 1. Engineered drawing did not match the site specific observations. The engineer used was not the original designer on record and the new engineer needs to provide a letter including the review of the entire wall bracing with site specific alternative methods as approved. Including threaded re-rod and block construction. Note: No glass doors/panels installed in shower or tub compartments. (not required) Note: No A/C installed (not required)
- Mar 27, 2025
Well Affidavit
PassInspectorAlejandra Sanchez
Received Well and Boring Construction Record
- Mar 26, 2025
Water Test Results
PassInspectorAlejandra Sanchez
Received Water Analysis Report.
- Mar 24, 2025
Final Building
NotesInspectorEric Hoffman
Spoke with mechanical contractor to verify the HRV does not need external damper on exhaust. He (Curt) plans on installing 1/4" galv hardware cloth to bath fan exhaust behind the damper. This would be approved.
- Mar 21, 2025
Final Building
Orders IssuedInspectorEric Hoffman
-Needs Water test document -Needs Well Affidavit -Needs Septic Inspection Report with tanks as passed with alarm verification -Needs ground breaker -Needs HRV damper on exhaust hood or documention otherwise -Needs Screen in bath fan hood on rear wall only -Needs safety glass for tub window and shower door -No A/C installed
- Mar 21, 2025
Framing
Partial PassInspectorEric Hoffman
Correction notes from 1/2/25 still need verification. Not provided at building final.
- Mar 21, 2025
Rough Plumbing
PassInspectorEric Hoffman
- Mar 21, 2025
Heating Final
PassInspectorEric Hoffman
- Mar 21, 2025
Plumbing Final
PassInspectorEric Hoffman
- Mar 6, 2025
Plumbing Final
Partial PassInspectorDean Becker
Manometer test included. Verify Hot & Cold running water at the building final inspection.
- Mar 6, 2025
Backflow Preventer
PassInspectorDean Becker
- Mar 3, 2025
Framing
Partial PassInspectorEric Hoffman
All floor joists and framing in basement okay. Correction from 1/2/25 for portal frame hold-downs still need verification.
- Mar 3, 2025
Heating Final
Partial PassInspectorEric Hoffman
Verify proper operation of the exhaust fans at the building final inspection.
- Mar 3, 2025
Rough Heating
PassInspectorEric Hoffman
Lower level rough-in complete.
- Feb 19, 2025
Plumbing Final
CanceledInspectorDave Rankin
- Feb 18, 2025
Lath
PassInspectorEric Hoffman
- Jan 6, 2025
Floor Poly
PassInspectorDean Becker
Contractor responsible to seal hole in vapor barrier at the base of the stairs prior to pouring concrete. Radon pulled from drain-tile.
- Jan 2, 2025
Rough Heating
Partial PassInspectorEric Hoffman
All appeared OK except basement return branches for future finish not ran and were stubbed out in utility room. Framing in basement only will need to be re inspected after returns are ran.
- Jan 2, 2025
Framing
Partial PassInspectorEric Hoffman
1. Basement heating returns not installed and floor trusses will need to be inspected once complete. (told justin not to cover ceiling in bsmt) 2. Portal frame hold-downs in garage need engineering for repairs still. ***orders from 12/26/24 otherwise appeared OK***
- Jan 2, 2025
Insulation
PassInspectorEric Hoffman
- Jan 2, 2025
Floor Poly
PassInspectorEric Hoffman
Show 9 earlier inspections
- Dec 31, 2024
Underground Rough In
PassInspectorNick Gilliland
Air pressure test included.
- Dec 30, 2024
Rough Heating
Not ReadyInspectorBrant Schreder
not fully complete, can be verified with framing corrections at future inspection.
- Dec 26, 2024
Framing
Orders IssuedInspectorNick Gilliland
1. Galvanized Staples were used in treated plate, Staples required to be of stainless steel or Galvanized nails per R317.3.1. 2. Bracing in floor trusses were cut out by heating contractor and need to be replaced 3. Header in bedroom #2 required to be a 2ply 9.5 LVL per plan S2 4. Basement patio door not secured at top and missing flashing tape. 5. all seames in WRB to be sealed with approved Tape including vertical seams. 6. STHD 14 straps are not approved for uplift into the concrete garage floor. 1/2" anchor bolts were installed in place of the approved 5/8"bolts in the garage portal wall per page S5 detail D8. Engineered repair required. 7. Plumbing underground and Floor poly must pass. *OK to insulate as long as all repairs are visible*
- Dec 26, 2024
Rough Heating
Partial PassInspectorNick Gilliland
All seams in ductwork to be sealed including the adjustable elbows per code.
- Dec 17, 2024
Rough Plumbing
Partial PassInspectorDean Becker
Included air test for all except kitchen which will be tested with the underground air test. Radon to be pulled from the drain-tile. Radon pipe is insulated in the attic.
- Dec 17, 2024
Footing
PassInspectorDean Becker
Address numbers are posted.
- Nov 19, 2024
Foundation
PassInspectorDean Becker
Contractor responsible to ensure slip sheet is in place prior to backfilling due to wind issues.
- Nov 13, 2024
Footing
Partial PassInspectorBrant Schreder
Address numbers shall be posted and visible for the duration of the project.
- Nov 6, 2024
Footing
Not ReadyInspectorDean Becker
No address is posted.