PULLFIRST[THE RECORD]
Permit / Ramsey← Search
#RA060713

Building

7007 168th La NW, Ramsey

IssuedFeb 26, 2025
StatusUnknown
Value$325,893
Inspections13
Scope of work

Repair

Location context
Parcel103225320062
Coordinates45.27699, -93.44539
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedFeb 26, 2025
IssuedFeb 26, 2025
Inspection record
Inspections13
Passed8
Failed0
  1. Jun 5, 2025

    Final Building

    Orders Issued

    InspectorDean Becker

    All will pass once a copy of the Helical Pier report has been received, reviewed, and approved ( from 4/2/2025 footing inspection). dean@rumrivercc.com.
  2. Jun 5, 2025

    Footing

    Pass

    InspectorDean Becker

    Received, reviewed, and approved the helical report.
  3. Jun 2, 2025

    Lath

    Pass

    InspectorDean Becker

  4. Apr 30, 2025

    Insulation

    Pass

    InspectorDean Becker

  5. Apr 25, 2025

    Framing/Sheathing /Rim Joist

    Pass

    InspectorEric Hoffman

    All corrections from 4/10/25 completed. Updated plans on file for narrow wall details on garage bays.
  6. Apr 10, 2025

    Framing/Sheathing /Rim Joist

    Orders Issued

    InspectorDean Becker

    (4) Garage brace wall hold downs need screws on 2 of 4 locations. (6) Need portal frame detail clarified. Build to plan (8) Needs CS16 coil straps at ends of upper level wall facing street. (the two adjacent walls on sides are good). May need additional engineering for alternative.
  7. Apr 10, 2025

    Insulation

    Partial Pass

    InspectorDean Becker

    House Only - no garage insulation installed at time of inspection.
  8. Apr 7, 2025

    Framing/Sheathing /Rim Joist

    Orders Issued

    InspectorEric Hoffman

    (3) Needs C10 Truss fix inspected (All fixes on file now) (4) Garage brace wall hold downs need screws on 2 of 4 locations. (6) Need portal frame detail clarified. Build to plan (8) Needs CS16 coil straps at ends of upper level wall facing street. (the two adjacent walls on sides are good). May need additional engineering for alternative. ***Gave ok to insulate house and spray foam garage rim and HVAC trunk, check for C10 fix at insulation, they will need to leave the garage front uncovered as the portal framing issue need to be corrected***
  9. Apr 7, 2025

    Footing

    Partial Pass

    InspectorEric Hoffman

    Affidavit on file for core filling per plan
  10. Apr 7, 2025

    Window/Door Installation

    Pass

    InspectorEric Hoffman

    Rough -in of windows / doors ok. Review completed installation at final
  11. Apr 7, 2025

    Water-Resistive Barrier

    Pass

    InspectorEric Hoffman

    Contractor ensures window facing street will have the seams taped.
  12. Apr 2, 2025

    Footing

    Notes

    InspectorEric Hoffman

    Needs helical report for final Needs pictures of core filled block at PSL post in garage
  13. Apr 2, 2025

    Framing/Sheathing /Rim Joist

    Orders Issued

    InspectorEric Hoffman

    (1) Needs WRB and Window/Door Inspections to pass before drywall and siding. Ran out of time at framing. (2) Needs Truss Fixes for file x 4 trusses (fixes for 3 of 4 were verified) (3) Needs C10 Truss fix inspected (1 of the 4) (4) Garage brace wall hold downs need screws on 2 of 4 locations. (5) Need plan update for garage 3-ply beam alternative. Girder truss observed. (6) Need portal frame detail clarified. No hold-downs observed. Block construction. (7) Need pictures of core filled garage block under PSL post in garage. (8) Needs CS16 coil straps at ends of upper level wall facing street. (the two adjacent walls on sides are good)