PULLFIRST[THE RECORD]
Permit / Ramsey← Search
#RA062762

Building

7071 139th Pl NW, Ramsey

IssuedAug 21, 2025
StatusUnknown
Value$303,240
Inspections17
Scope of work

New, Multi-Family Unit

Location context
Parcel343225220079
Coordinates45.22174, -93.44410
Loading map…
196 nearby
This permitNearby
Fees & payments
Total fees$22.95
Total paid$22.95
Timeline
ApprovedAug 14, 2025
IssuedAug 21, 2025
Inspection record
Inspections17
Passed11
Failed0
  1. Jan 14, 2026

    Framing/Sheathing /Rim Joist

    Orders Issued

    InspectorDave Rankin

    - Verified Nails in header bracket. - Ridge vent can not be within 4' of firewall.
  2. Jan 9, 2026

    Framing/Sheathing /Rim Joist

    Partial Pass

    InspectorDave Rankin

    - Header bracket at stairs missing nails - Ridge vent can not be within 4' of firewall
  3. Dec 30, 2025

    Framing/Sheathing /Rim Joist

    Not Ready

    InspectorDave Rankin

  4. Dec 22, 2025

    Framing/Sheathing /Rim Joist

    Orders Issued

    InspectorDave Rankin

    - Anchor bolts missing on east side below window and at garage entry door by bathroom. - Hole in sheathing at front door - 2 studs missing for girder in garage by entry door - Header bracket at stairs missing nails - Fire rated sheathing within 4' at roof line. - Ridge vent can not be within 4' of firewall - Verify headers
  5. Dec 22, 2025

    Fire Wall

    Pass

    InspectorDave Rankin

  6. Dec 4, 2025

    Framing/Sheathing /Rim Joist

    Notes

    InspectorDave Rankin

    See headers/brackets and trusses cut at stairs
  7. Dec 4, 2025

    Rough Heating

    Orders Issued

    InspectorDave Rankin

    Seams have not been sealed. Pass through returns not allowed. Engineered load calcs required
  8. Nov 26, 2025

    Rough Plumbing

    Pass

    InspectorJosh Guin

    Pressure test included
  9. Nov 3, 2025

    Fire Wall

    Partial Pass

    InspectorDave Rankin

    2nd floor
  10. Oct 28, 2025

    Fire Wall

    Partial Pass

    InspectorDean Becker

    All lower level fire walls and corrections from 10/24/2025 are complete.
  11. Oct 24, 2025

    Fire Wall

    Orders Issued

    InspectorMichael Yoakam

    1) Main floor only inspected on 10-24-2025. 2nd floor inspection to be scheduled by contractor 2) Gaps in gypsum exceeding 1/4" must be caulked with fire code approved caulking 3) Nailing pattern pass on lower level
  12. Oct 15, 2025

    Floor Poly

    Pass

    InspectorDave Rankin

  13. Oct 6, 2025

    Underground Rough In

    Pass

    InspectorMichael Yoakam

  14. Sep 30, 2025

    Foundation

    Pass

    InspectorJosh Guin

  15. Sep 24, 2025

    Poured Wall

    Pass

    InspectorJosh Guin

  16. Sep 16, 2025

    Footing

    Pass

    InspectorDean Becker

  17. Sep 9, 2025

    Sewer/Water

    Pass

    InspectorCameron Erickson