Permit / Ramsey← Search
#RA061210Building
14722 Alpaca Ter NW, Ramsey
IssuedAug 26, 2025
StatusUnknown
Value$290,835
Inspections22
Scope of work
New, New Dwelling
Location context
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedApr 10, 2025
IssuedAug 26, 2025
Inspection record
Inspections22
Passed16
Failed0
- Apr 13, 2026·10:00 AM - 10:30 AM
Heating Final
scheduledInspectorDean Becker
- Apr 10, 2026
Lath
PassInspectorDean Becker
- Apr 6, 2026
Insulation
PassInspectorDean Becker
All corrections from 2/26/2026 are complete.
- Apr 6, 2026
Framing/Sheathing /Rim Joist
PassInspectorDean Becker
All corrections from 2/26/2026 are complete.
- Apr 6, 2026
Final Building
Orders IssuedInspectorDean Becker
Corrections: (1) No lath or stone installed at time of inspection. Schedule lath inspection once lath is installed. (2) Seal around water main for Radon. (3) Plumbing caps to be removed from the roof vents. The driveway was complete at time of inspection. The landscaping was NOT complete at time of inspection.
- Apr 6, 2026
Heating Final
Orders IssuedInspectorDean Becker
Manometer test did not pass. Please re-schedule one corrections are complete.
- Apr 1, 2026
Plumbing Final
Partial PassInspectorDean Becker
Included a manometer test. Verify hot running water at the building final.
- Mar 31, 2026
Water Meter & Remote Install
PassInspectorJason Lunde
- Feb 26, 2026
Rough Plumbing
PassInspectorDean Becker
All corrections from 2/19/2026 are complete.
- Feb 26, 2026
Framing/Sheathing /Rim Joist
Orders IssuedInspectorDean Becker
(3) Attic venting over top of garage is required. All other corrections from 2/24/2026 are complete.
- Feb 26, 2026
Insulation
Partial PassInspectorDean Becker
Attic venting over top of garage is required. Okay to install Gypsum.
- Feb 26, 2026
Rough Heating
PassInspectorDean Becker
All corrections from 2/20/2026 are complete.
- Feb 24, 2026
Framing/Sheathing /Rim Joist
Orders IssuedInspectorDave Rankin
Corrections: (1) Main trunk in garage ceiling to be insulated. (2) No roof jack installed for the upper level bath fans at the time of inspection. (3) Attic venting required over top of garage.
- Feb 20, 2026
Rough Heating
Partial PassInspectorDean Becker
Corrections: (1) Main trunk in garage ceiling to be insulated. (2) No roof jack installed for the upper level bath fans at the time of inspection.
- Feb 19, 2026
Rough Plumbing
Partial PassInspectorDean Becker
Included air test. (1) No roof jacks installed at time of inspection - to be verified at the framing inspection.
- Feb 19, 2026
Backflow Preventer
Not RequiredInspectorDean Becker
This property will be connected to a community irrigation system.
- Oct 7, 2025
Floor Poly
PassInspectorDean Becker
Radon pulled from (2)10' perforated pipes. Address to be posted.
- Sep 29, 2025
Underground Rough In
PassInspectorJosh Guin
- Sep 25, 2025
Sewer/Water
PassInspectorJordan Evans
- Sep 23, 2025
Foundation
PassInspectorJosh Guin
- Sep 18, 2025
Poured Wall
PassInspectorJosh Guin
- Sep 15, 2025
Footing
PassInspectorJosh Guin
Plans not on site. Measured footing widths and depths. Setbacks cannot be determined without plans. Pour at your own risk.