PULLFIRST[THE RECORD]
Permit / Ramsey← Search
#RA062634

Building

14701 Armstrong Blvd NW, Ramsey

IssuedAug 27, 2025
StatusUnknown
Value$311,549
Inspections17
Scope of work

New, New Building

Location context
Parcel999999914701
Coordinates45.23755, -93.47026
Loading map…
188 nearby
This permitNearby
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedAug 26, 2025
IssuedAug 27, 2025
Inspection record
Inspections17
Passed15
Failed0
  1. Dec 15, 2025

    Final Building

    Orders Issued

    InspectorDave Rankin

    Caulking required around backflow and flashing at soffit by drive thru Front entrance missing flashing, OSB exposed
  2. Dec 15, 2025

    Framing

    Pass

    InspectorDave Rankin

  3. Dec 15, 2025

    Backflow Preventer

    Pass

    InspectorDave Rankin

  4. Dec 1, 2025

    Erosion Control

    Not approved

    InspectorAaron Madsen

    Per conversation with Aaron Madsen on 12/1/25; failed. Erosion Control is still up.
  5. Nov 24, 2025

    Lath

    Pass

    InspectorDave Rankin

  6. Nov 21, 2025

    Lath

    Partial Pass

    InspectorDave Rankin

    Liquid membrane applied.
  7. Nov 21, 2025

    Water-Resistive Barrier

    Pass

    InspectorDave Rankin

  8. Nov 13, 2025

    Framing

    Orders Issued

    InspectorDave Rankin

    Truss bracing missing on A4, A11, A17, A22 Headers and beams above windows missing screws in brackets Truss repair required at C4. Need document
  9. Nov 13, 2025

    Insulation

    Partial Pass

    InspectorDave Rankin

  10. Nov 3, 2025

    Landscaping Final

    Partial Pass

    InspectorChris Anderson

    Most trees/shrubs/perennials are in, with the exception of the greenspace south of the entry road, which is missing a crabapple, a black hills spruce, a patriot elm, a boulevard linden, and a hackberry (it appeared that the trees were on site, just not installed yet). This area also has not be seeded yet. Also missing 1 crabapple east of building, and the 5 Japanese yews and 5 mint julep junipers south of building. Where seeding has been installed, it has not yet germinated or established.
  11. Oct 31, 2025

    Framing

    Partial Pass

    InspectorDave Rankin

    Parapets only
  12. Oct 20, 2025

    Topsoil

    Pass

    InspectorJosh Osen

    Per email from Josh Osen on 10/20/25; passed
  13. Sep 26, 2025

    Foundation

    Pass

    InspectorDave Rankin

  14. Sep 24, 2025

    Poured Wall

    Pass

    InspectorDave Rankin

  15. Sep 23, 2025

    Poured Wall

    Partial Pass

    InspectorDave Rankin

    Main building only -
  16. Sep 23, 2025

    Footing

    Pass

    InspectorDave Rankin

  17. Sep 19, 2025

    Footing

    Partial Pass

    InspectorDave Rankin

    building only - trash enclosure not ready

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.