#RA061803

Building

8421 156th La NW, Ramsey

IssuedSep 25, 2025
StatusUnknown
Value$65,000
Inspections8
Scope of work

Remodel

Location context
Parcel203225210004
Coordinates45.25525, -93.48174
Loading map…
198 nearby
This permitNearby
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedSep 25, 2025
IssuedSep 25, 2025
Inspection record
Inspections8
Passed5
Failed0
  1. Jan 9, 2026

    Other

    Pass

    InspectorThomas Knight

    Head clearance in bathroom is below 6'4 inches. Ductwork was existing. Inspectors offered multiple solutions for a less hazardous condition such as moving the bathroom to a different location at time of rough in, Re-routing ductwork. Contractor chose to cover the ductwork without any change.
  2. Jan 7, 2026

    Final

    Orders Issued

    InspectorThomas Knight

    Missing Smoke and Carbon Monoxide detectors on the main floor. Handrail to basement is not code compliant. Pull permit for mechanical work. Electrical is not signed off. Head clearance in bathroom is below 6'4 inches. Ductwork was existing. Inspectors offered multiple solutions for a less hazardous condition such as moving the bathroom to a different location at time of rough in, Re-routing ductwork. Contractor chose to cover the ductwork without any change.
  3. Jan 7, 2026

    Framing/Sheathing /Rim Joist

    Pass

    InspectorThomas Knight

    Head clearance in bathroom is below 6'4 inches. Ductwork was existing. Inspectors offered multiple solutions for a less hazardous condition such as moving the bathroom to a different location at time of rough in, Re-routing ductwork. Contractor chose to cover the ductwork without any change.
  4. Jan 7, 2026

    Insulation

    Pass

    InspectorThomas Knight

    Head clearance in bathroom is below 6'4 inches. Ductwork was existing. Inspectors offered multiple solutions for a less hazardous condition such as moving the bathroom to a different location at time of rough in, Re-routing ductwork. Contractor chose to cover the ductwork without any change.
  5. Nov 12, 2025

    Other

    Orders Issued

    InspectorJosh Guin

    Site visit required by Building Official to determine if exception may be allowed.
  6. Nov 10, 2025

    Framing/Sheathing /Rim Joist

    Partial Pass

    InspectorThomas Knight

    Per josh Guin all framing was Okay with the exception of head clearance concern
  7. Nov 10, 2025

    Insulation

    Partial Pass

    InspectorJosh Guin

    Outside of bathroom ok to sheetrock
  8. Oct 16, 2025

    Other

    Orders Issued

    InspectorDave Rankin

    Mechanical permit required. - Trunk line in bathroom measures 6' 3/4" before floor is in and ceiling finished. Butts up against tub. Must not be less than 6'4" finished. - single wall vent in garage penetrates firewall. not allowed. - Double hung window in basement bedroom must meet emergency and rescue opening requirements