#RA062196

Building

7437 147th La NW, Ramsey

IssuedOct 1, 2025
StatusUnknown
Value$317,168
Inspections22
Scope of work

New, New Dwelling

Location context
Parcel283225120097
Coordinates45.23784, -93.45665
Loading map…
198 nearby
This permitNearby
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedSep 22, 2025
IssuedOct 1, 2025
Inspection record
Inspections22
Passed16
Failed0
  1. Mar 4, 2026

    Final Building

    Pass

    InspectorDean Becker

    All corrections from 3/3/2025 are complete.
  2. Mar 3, 2026

    Final Building

    Partial Pass

    InspectorDean Becker

    All corrections from 2/18/2026 are complete except: (4) Plumbing caps to be removed from all roof vents on the roof. (7) Stairs to be built in the garage for the service door from the house. Pictures are okay for re-inspection - dbecker@cityoframsey.com.
  3. Mar 3, 2026

    Backflow Preventer

    Not Required

    InspectorDean Becker

    No irrigation is being installed at this time.
  4. Feb 18, 2026

    Heating Final

    Pass

    InspectorDean Becker

    Contractor responsible to ensure all diffusers are installed once the carpet is installed.
  5. Feb 18, 2026

    Plumbing Final

    Pass

    InspectorDean Becker

    Verified hot/cold running water. Contractor responsible to ensure the kitchen sink is installed with a compliant trap once the new countertops are installed.
  6. Feb 18, 2026

    Final Building

    Orders Issued

    InspectorDean Becker

    Corrections: (1) Electrical final inspection to be passed. (2) R319.1 The address identification shall be visible from the street or road at the front of the property. (3) Fire blocking of all penetrations in the ceiling of the mechanical room is required. (4) Plumbing caps to be removed from all vents on the roof. (5) Upper level patio door to be blocked to a maximum opening of 4". (6) Seal around radon pipe and any other holes in the sump baskit lid for radon. (7) Stairs to be built in the garage for the service door from the house. The driveway and landscaping was NOT complete at the time of inspection.
  7. Feb 10, 2026

    Water Meter & Remote Install

    Pass

    InspectorJason Lunde

  8. Feb 10, 2026·1:30 PM - 2:00 PM

    Heating Final

    scheduled

    InspectorDean Becker

  9. Feb 10, 2026·1:00 PM - 1:30 PM

    Plumbing Final

    scheduled

    InspectorDean Becker

  10. Feb 10, 2026

    Plumbing Final

    Partial Pass

    InspectorDean Becker

    Included a manometer test. Verify hot/cold running water at the building final.
  11. Feb 10, 2026

    Heating Final

    Partial Pass

    InspectorDean Becker

    Included a manometer test. No diffusers installed in floors at time of inspection - to be verified at the building final.
  12. Dec 19, 2025

    Insulation

    Pass

    InspectorMichael Yoakam

  13. Dec 19, 2025

    Framing/Sheathing /Rim Joist

    Pass

    InspectorMichael Yoakam

    Confirmed truss lock screws via video and pictures on-site. Confirmed lateral bracing installed
  14. Dec 9, 2025

    Framing/Sheathing /Rim Joist

    Orders Issued

    InspectorDave Rankin

    Missing truss lock screws Lateral bracing missing on T1 and T2 Trusses
  15. Dec 2, 2025

    Rough Heating

    Pass

    InspectorJosh Guin

    Gas high pressure test included. Ducts are to be aero sealed.
  16. Nov 26, 2025

    Rough Heating

    Orders Issued

    InspectorJosh Guin

    Gas high pressure test failed
  17. Nov 18, 2025

    Floor Poly

    Pass

    InspectorJosh Guin

  18. Nov 10, 2025

    Rough Plumbing

    Pass

    InspectorJosh Guin

  19. Nov 10, 2025

    Underground Rough In

    Pass

    InspectorJosh Guin

  20. Oct 16, 2025

    Sewer/Water

    Pass

    InspectorMatt Graf

  21. Oct 14, 2025

    Foundation

    Pass

    InspectorMichael Yoakam

  22. Oct 7, 2025

    Footing

    Pass

    InspectorDean Becker