IssuedOct 1, 2025
StatusUnknown
Value$317,168
Inspections22
Scope of work
New, New Dwelling
Location context
Loading map…
198 nearby
This permitNearby
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedSep 22, 2025
IssuedOct 1, 2025
Inspection record
Inspections22
Passed16
Failed0
- Mar 4, 2026
Final Building
PassInspectorDean Becker
All corrections from 3/3/2025 are complete.
- Mar 3, 2026
Final Building
Partial PassInspectorDean Becker
All corrections from 2/18/2026 are complete except: (4) Plumbing caps to be removed from all roof vents on the roof. (7) Stairs to be built in the garage for the service door from the house. Pictures are okay for re-inspection - dbecker@cityoframsey.com.
- Mar 3, 2026
Backflow Preventer
Not RequiredInspectorDean Becker
No irrigation is being installed at this time.
- Feb 18, 2026
Heating Final
PassInspectorDean Becker
Contractor responsible to ensure all diffusers are installed once the carpet is installed.
- Feb 18, 2026
Plumbing Final
PassInspectorDean Becker
Verified hot/cold running water. Contractor responsible to ensure the kitchen sink is installed with a compliant trap once the new countertops are installed.
- Feb 18, 2026
Final Building
Orders IssuedInspectorDean Becker
Corrections: (1) Electrical final inspection to be passed. (2) R319.1 The address identification shall be visible from the street or road at the front of the property. (3) Fire blocking of all penetrations in the ceiling of the mechanical room is required. (4) Plumbing caps to be removed from all vents on the roof. (5) Upper level patio door to be blocked to a maximum opening of 4". (6) Seal around radon pipe and any other holes in the sump baskit lid for radon. (7) Stairs to be built in the garage for the service door from the house. The driveway and landscaping was NOT complete at the time of inspection.
- Feb 10, 2026
Water Meter & Remote Install
PassInspectorJason Lunde
- Feb 10, 2026·1:30 PM - 2:00 PM
Heating Final
scheduledInspectorDean Becker
- Feb 10, 2026·1:00 PM - 1:30 PM
Plumbing Final
scheduledInspectorDean Becker
- Feb 10, 2026
Plumbing Final
Partial PassInspectorDean Becker
Included a manometer test. Verify hot/cold running water at the building final.
- Feb 10, 2026
Heating Final
Partial PassInspectorDean Becker
Included a manometer test. No diffusers installed in floors at time of inspection - to be verified at the building final.
- Dec 19, 2025
Insulation
PassInspectorMichael Yoakam
- Dec 19, 2025
Framing/Sheathing /Rim Joist
PassInspectorMichael Yoakam
Confirmed truss lock screws via video and pictures on-site. Confirmed lateral bracing installed
- Dec 9, 2025
Framing/Sheathing /Rim Joist
Orders IssuedInspectorDave Rankin
Missing truss lock screws Lateral bracing missing on T1 and T2 Trusses
- Dec 2, 2025
Rough Heating
PassInspectorJosh Guin
Gas high pressure test included. Ducts are to be aero sealed.
- Nov 26, 2025
Rough Heating
Orders IssuedInspectorJosh Guin
Gas high pressure test failed
- Nov 18, 2025
Floor Poly
PassInspectorJosh Guin
- Nov 10, 2025
Rough Plumbing
PassInspectorJosh Guin
- Nov 10, 2025
Underground Rough In
PassInspectorJosh Guin
- Oct 16, 2025
Sewer/Water
PassInspectorMatt Graf
- Oct 14, 2025
Foundation
PassInspectorMichael Yoakam
- Oct 7, 2025
Footing
PassInspectorDean Becker