Permit / Ramsey← Search
#RA063795

Building

5817 151st La NW, Ramsey

IssuedNov 19, 2025
StatusUnknown
Value$491,282
Inspections22
Scope of work

New, New Dwelling

Location context
Parcel999999995817
Coordinates45.24576, -93.41499
Loading map…
198 nearby
This permitNearby
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedNov 18, 2025
IssuedNov 19, 2025
Inspection record
Inspections22
Passed18
Failed0
  1. Apr 6, 2026

    Heating Final

    Pass

    InspectorDean Becker

    Included a manometer test.
  2. Apr 6, 2026

    Fireplace Final

    Orders Issued

    InspectorDean Becker

    Not operational at time of inspection. Re-inspection can be done at the building final.
  3. Apr 6, 2026

    Backflow Preventer

    Pass

    InspectorDean Becker

  4. Apr 3, 2026

    Water Meter & Remote Install

    Pass

    InspectorJason Lunde

  5. Apr 3, 2026

    Plumbing Final

    Partial Pass

    InspectorDean Becker

    Included a manometer test. To be verified at the building final: (1) Master bath tub not installed at time of inspection. (2) Upstairs hallway bath - verify repairs to tub are complete.
  6. Mar 16, 2026

    Lath

    Pass

    InspectorDave Rankin

  7. Feb 12, 2026

    Framing/Sheathing /Rim Joist

    Pass

    InspectorDean Becker

    All corrections from 2/9/2026 are complete and the passing load specs have been added to the file.
  8. Feb 12, 2026

    Insulation

    Pass

    InspectorDean Becker

    All corrections are complete.
  9. Feb 12, 2026

    Floor Poly

    Pass

    InspectorDean Becker

    Contractor responsible to ensure all plumbing penetrations are protected Per MN Plumbing Code 312.2 as discussed with Ron - Contractor and Pete - Concrete Contractor via phone conversation.
  10. Feb 10, 2026

    Underground Rough In

    Pass

    InspectorDean Becker

    Included air test. Radon to be pulled from the sump basket.
  11. Feb 9, 2026

    Rough Heating

    Pass

    InspectorDean Becker

  12. Feb 9, 2026·10:30 AM - 11:00 AM

    Insulation

    scheduled

    InspectorDean Becker

  13. Feb 9, 2026

    Framing/Sheathing /Rim Joist

    Partial Pass

    InspectorDean Becker

    All corrections from 2/4/2026 are complete EXCEPT: (2) Garage to mud room service door header Does not match the reviewed plans.
  14. Feb 9, 2026

    Insulation

    Partial Pass

    InspectorDean Becker

    All passes - waiting for verification of the garage to mud room service door header corrections to be complete. Okay to install gypsum on all except garage to mud room service door. Contractor responsible to ensure all door and window foam insulation is adequate. Table R402.4.1.1 Bath exhaust fan to be sealed air tight as it is an attic bypass by code definition.
  15. Feb 9, 2026

    Fireplace Rough In

    Pass

    InspectorDean Becker

  16. Feb 4, 2026

    Framing/Sheathing /Rim Joist

    Orders Issued

    InspectorDean Becker

    Corrections: (1) Garage front wall header to Jack-stud straps to be installed per Table R602.10..6.4. (2)Garage to mud room service door header does not match the reviewed plans ((2)2x10 installed - (2)1.75x9.5 LVL required). Either submit passing load calcs from a licensed design professional or replace with what is on the plan. (3) Fireblocking required above the Flexroom electric fireplace. (4) R317.1 & 3 - Fasteners into treated lumber at treated base plate. (5) Floor truss unbalanced blocking is required on the wall next to the work shop per R404.1(4) and spaced per Table R404.1(1).
  17. Feb 4, 2026

    Rough Heating

    Partial Pass

    InspectorDean Becker

    Included was the upper levels. No lower level mechanical inspection was done at time of inspection.
  18. Jan 12, 2026

    Rough Plumbing

    Partial Pass

    InspectorDean Becker

    Included air test. Lower level water lines not installed @ time of inspection - to be verified at the underground rough-in. Radon to be pulled from the sump basket per contractor.
  19. Dec 11, 2025

    Sewer/Water

    Pass

    InspectorCameron Erickson

  20. Dec 11, 2025

    Foundation

    Pass

    InspectorDean Becker

  21. Dec 9, 2025

    Foundation

    Not Ready

    InspectorDean Becker

    Was told by excavator that the waterproofing crew had sprayer issues and had to leave.
  22. Nov 25, 2025

    Footing

    Pass

    InspectorDave Rankin