PULLFIRST[THE RECORD]
Permit / Ramsey← Search
#RA064269

Building

14665 Sodium St NW, Ramsey

IssuedFeb 2, 2026
StatusUnknown
Value$266,006
Inspections17
Scope of work

New, New Dwelling

Location context
Parcel999999914665
Coordinates45.23710, -93.42189
Loading map…
198 nearby
This permitNearby
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedJan 29, 2026
IssuedFeb 2, 2026
Inspection record
Inspections17
Passed12
Failed0
  1. Apr 15, 2026·2:00 PM - 2:30 PM

    Heating Final

    scheduled

    InspectorDean Becker

  2. Apr 14, 2026·10:00 AM - 10:30 AM

    Water Meter & Remote Install

    scheduled

    InspectorUtilities

  3. Apr 14, 2026·1:30 PM - 2:00 PM

    Plumbing Final

    scheduled

    InspectorDean Becker

  4. Apr 1, 2026

    Lath

    Pass

    InspectorDean Becker

  5. Mar 11, 2026

    Insulation

    Pass

    InspectorDean Becker

  6. Mar 10, 2026

    Framing/Sheathing /Rim Joist

    Pass

    InspectorDave Rankin

    All corrections from 3/9/2026 are complete and verified via pictures.
  7. Mar 9, 2026

    Rough Plumbing

    Pass

    InspectorDean Becker

    Roof jacks installed.
  8. Mar 9, 2026

    Framing/Sheathing /Rim Joist

    Orders Issued

    InspectorDean Becker

    Corrections: (1) R317.1 & 3 - Verify that stainless staples are installed into the treated lumber. (2) Electrical rough-in inspection not complete at time of inspection.
  9. Mar 9, 2026

    Rough Heating

    Pass

    InspectorDean Becker

    Included gas line air test. Ductwork to be Aerosealed - Submit Aeroseal report once complete.
  10. Mar 4, 2026

    Rough Plumbing

    Partial Pass

    InspectorDean Becker

    Included air test. Radon pipe is insulated in the attic. Roof jacks not installed at time of inspection. Verify at the framing inspection.
  11. Mar 2, 2026

    Floor Poly

    Pass

    InspectorDean Becker

    Radon to be pulled from the sump basket.
  12. Feb 27, 2026

    Underground Rough In

    Pass

    InspectorDean Becker

    Included air test. Radon to be pulled from the sump basket.
  13. Feb 13, 2026

    Sewer/Water

    Pass

    InspectorJason Lunde

  14. Feb 11, 2026

    Foundation

    Pass

    InspectorDean Becker

    Contractor responsible to ensure that the left side jump meets the 42" minimum frost protection depth as discussed with Tim - Price homes via a phone conversation.
  15. Feb 11, 2026·3:30 PM - 4:00 PM

    Foundation

    scheduled

    InspectorDean Becker

  16. Feb 6, 2026

    Poured Wall

    Pass

    InspectorDean Becker

  17. Feb 5, 2026

    Footing

    Pass

    InspectorDean Becker

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.