PULLFIRST[THE RECORD]
Permit / Golden Valley← Search
#GV118309

Building

4900 Bassett Creek Dr, Golden Valley

IssuedJun 25, 2024
StatusUnknown
Value$90,000
Inspections15
Scope of work

New, Construct an Accessory Structure

Location context
Parcel1802924210018
Coordinates45.00436, -93.34166
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$640.32
Total paid$640.32
Timeline
ApprovedJun 24, 2024
IssuedJun 25, 2024
Inspection record
Inspections15
Passed10
Failed0
  1. Oct 29, 2024

    Verify Electrical Final

    Completed

    InspectorMike Lockman

    Electrical final sticker posted in the panel
  2. Oct 29, 2024

    Energy Code-Lighting Schedule Form

    Not Required

    InspectorMike Lockman

    Finishes will be completed by homeowner
  3. Oct 29, 2024

    Insulation

    Not Required

    InspectorMike Lockman

    Insulation & Finishes will be completed by homeowner
  4. Oct 29, 2024

    Other - Smoke & Carbon Alarm at Time of Final

    Not Required

    InspectorMike Lockman

    Finishes to be completed by homeowner
  5. Oct 24, 2024

    Framing

    Need Correction

    InspectorMike Lockman

    Missing anchor bolt at seam in bottom plate on the N wall
  6. Aug 28, 2024

    Submit Pictures of House Wrap

    Completed

    InspectorBret Eggers

    Say wrap while doing another inspection
  7. Aug 28, 2024

    Insulation - Under Slab

    Completed

    InspectorBret Eggers

    2" rigid
  8. Aug 28, 2024

    Floor Slab

    Completed

    InspectorMike Lockman

    6 Mil poly below 2" rigid foam insulation.
  9. Aug 28, 2024

    Radon Control

    Completed

    InspectorMike Lockman

    4" perforated DT w/ sock 10 ft each direction of tee. 3" vertical radon vent piped to 8 ft above slab and capped. Contractor is roughing in the project only - homeowner will be doing the finishes
  10. Aug 28, 2024

    Final

    Completed in Future.

    InspectorBret Eggers

    This permit is for the shell only. HO will complete all interior finish work. Final inspection on this permit is for framing
  11. Jul 16, 2024

    Footing - Reinforcing

    Completed

    InspectorBret Eggers

  12. Jul 16, 2024

    Foundation Insulation

    Completed

    InspectorBret Eggers

    R-10 non draining. Contractor will take pictures of slip sheet
  13. Jul 16, 2024

    Foundation Waterproofing

    Not Required

    InspectorBret Eggers

    Sandy base
  14. Jul 2, 2024

    Footing

    Completed

    InspectorMike Lockman

    8x16 Strip footing in sandy soils. SCWAP. Contractor will take photos of rebar reinforcement installation.
  15. Jul 2, 2024

    Verify Setbacks - Foundation

    Completed

    InspectorMike Lockman

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.