Permit / Golden Valley← Search
#GV118309Building
4900 Bassett Creek Dr, Golden Valley
IssuedJun 25, 2024
StatusUnknown
Value$90,000
Inspections15
Scope of work
New, Construct an Accessory Structure
Location context
Parcel1802924210018
Coordinates45.00436, -93.34166
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$640.32
Total paid$640.32
Timeline
ApprovedJun 24, 2024
IssuedJun 25, 2024
Inspection record
Inspections15
Passed10
Failed0
- Oct 29, 2024
Verify Electrical Final
CompletedInspectorMike Lockman
Electrical final sticker posted in the panel
- Oct 29, 2024
Energy Code-Lighting Schedule Form
Not RequiredInspectorMike Lockman
Finishes will be completed by homeowner
- Oct 29, 2024
Insulation
Not RequiredInspectorMike Lockman
Insulation & Finishes will be completed by homeowner
- Oct 29, 2024
Other - Smoke & Carbon Alarm at Time of Final
Not RequiredInspectorMike Lockman
Finishes to be completed by homeowner
- Oct 24, 2024
Framing
Need CorrectionInspectorMike Lockman
Missing anchor bolt at seam in bottom plate on the N wall
- Aug 28, 2024
Submit Pictures of House Wrap
CompletedInspectorBret Eggers
Say wrap while doing another inspection
- Aug 28, 2024
Insulation - Under Slab
CompletedInspectorBret Eggers
2" rigid
- Aug 28, 2024
Floor Slab
CompletedInspectorMike Lockman
6 Mil poly below 2" rigid foam insulation.
- Aug 28, 2024
Radon Control
CompletedInspectorMike Lockman
4" perforated DT w/ sock 10 ft each direction of tee. 3" vertical radon vent piped to 8 ft above slab and capped. Contractor is roughing in the project only - homeowner will be doing the finishes
- Aug 28, 2024
Final
Completed in Future.InspectorBret Eggers
This permit is for the shell only. HO will complete all interior finish work. Final inspection on this permit is for framing
- Jul 16, 2024
Footing - Reinforcing
CompletedInspectorBret Eggers
- Jul 16, 2024
Foundation Insulation
CompletedInspectorBret Eggers
R-10 non draining. Contractor will take pictures of slip sheet
- Jul 16, 2024
Foundation Waterproofing
Not RequiredInspectorBret Eggers
Sandy base
- Jul 2, 2024
Footing
CompletedInspectorMike Lockman
8x16 Strip footing in sandy soils. SCWAP. Contractor will take photos of rebar reinforcement installation.
- Jul 2, 2024
Verify Setbacks - Foundation
CompletedInspectorMike Lockman
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.