Building
518 Ardmore Dr, Golden Valley
New, New Home
- Jul 25, 2025
As-Built Survey
CompletedInspectorDan Anderson
- Jul 25, 2025
Final
CompletedInspectorDan Anderson
- Jul 24, 2025
Final
Completed in Future.InspectorBret Eggers
Everything completed except As Built
- Jul 24, 2025
Blower Door Test
CompletedInspectorBret Eggers
Final result 1.68 ACH50
- Jul 10, 2025
I & I Inspection
CompletedInspectorScott Johnson
- Jun 17, 2025
Final
Completed in Future.InspectorBret Eggers
1) I and I 2) Blower Door 3 As built 4) Draft stop floor cavity above wall between utility room and hallway 5) Repair door to utility room, does not close fully 6) Combustion air required in utility room
- Jun 17, 2025
Blower Door Test
Completed in Future.InspectorBret Eggers
- Jun 17, 2025
I & I Inspection
Completed in Future.InspectorBret Eggers
- Jun 17, 2025
Verify Electrical Final
CompletedInspectorMike Lockman
Verified final sticker inside electrical panel
- Jun 17, 2025
Radon Control
CompletedInspectorMike Lockman
Passive system installed & labeled
- Jun 17, 2025
As-Built Survey
Completed in Future.InspectorBret Eggers
- Jun 16, 2025
Submit Pictures of Ice & Water Shield
CompletedInspectorBrian Stemwedel
pictures emailed show compliant I & W on a simple gable roof. *NOTE: Could not verify ventilation
- Jun 16, 2025
Submit Pictures of House Wrap
CompletedInspectorBrian Stemwedel
Pictures emailed Zipwall system, pictures show joints sealed with correct product approved
- Jun 13, 2025
Submit Pictures of Ice & Water Shield
CompletedInspectorMike Lockman
Photos sent via email
- Jun 13, 2025
Submit Pictures of House Wrap
CompletedInspectorMike Lockman
Photos submitted via email. Contractor installed ZIP system wall sheathing
- Jun 13, 2025
Energy Code-Lighting Schedule Form
CompletedInspectorMike Lockman
Document submitted via email. Uploaded into LF
- May 29, 2025
Other - Deck Footing
CompletedInspectorBret Eggers
- Dec 10, 2024
Insulation
CompletedInspectorBret Eggers
- Dec 4, 2024
Framing
CompletedInspectorBret Eggers
- Aug 30, 2024
Drain Tile
CompletedInspectorBrian Stemwedel
Checked with Fnd waterproofing. DT set in river rock and covered w/ fabric
- Aug 30, 2024
Foundation Waterproofing
CompletedInspectorBrian Stemwedel
emulsified asphalt. noted over top of fnd. wall
- Aug 30, 2024
Foundation Insulation
CompletedInspectorBrian Stemwedel
2" rigid (non draining) foam insulation. (***note, ND rigid requires slip sheet below grade)
- Aug 13, 2024
Poured Wall
CompletedInspectorMike Lockman
Poured foundation walls per plan. Reinforcement ISCWAP
- Aug 8, 2024
Footing
CompletedInspectorBrian Stemwedel
(2) mats of rebar in spread footings per engineering and ISCWAP
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.