#GV120644

Building

1439 Alpine Pass, Golden Valley

IssuedAug 7, 2024
StatusUnknown
Value$65,000
Inspections13
Scope of work

Addition, 2 story addition 6 ft extension, crawlspace, dining, office, sep. LL bath refresh

Location context
Parcel3002924410058
Coordinates44.96793, -93.33251
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$521.04
Total paid$521.04
Timeline
ApprovedJul 26, 2024
IssuedAug 7, 2024
Inspection record
Inspections13
Passed12
Failed0
  1. Nov 21, 2024

    Insulation

    Completed

    InspectorMike Lockman

    Insulation report for attic received via email from GC & uploaded into LF
  2. Nov 21, 2024

    Final

    Completed

    InspectorMike Lockman

  3. Nov 19, 2024

    Other - Smoke & Carbon Alarm at Time of Final

    Completed

    InspectorMike Lockman

    Smoke and CO alarms compliant thru out
  4. Nov 15, 2024

    Submit Pictures of Ice & Water Shield

    Not Required

    InspectorMike Lockman

    Photos submitted and approved under a separate re-roof permit by another contractor. Permit GV121201
  5. Nov 13, 2024

    Lath

    Completed

    InspectorMike Lockman

    Lath on front bay addition. Proper installation w/ staples. Grade D paper installed behind lath as required
  6. Sep 25, 2024

    Submit Pictures of House Wrap

    Completed

    InspectorBret Eggers

    While on site for other inspections
  7. Sep 25, 2024

    Framing

    Completed

    InspectorBret Eggers

    Electrical inspection completed.
  8. Sep 25, 2024

    Insulation

    Completed in Future.

    InspectorBret Eggers

    OK to final when Insulation report approved (attic)
  9. Sep 20, 2024

    Foundation Insulation

    Completed

    InspectorMike Lockman

    Foil backed rigid insulation installed on interior of crawlspace foundation walls. Seams to be covered w/ foil tape.
  10. Sep 20, 2024

    Framing

    Completed in Future.

    InspectorMike Lockman

    All framing is SCWAP and may be approved once electrical RI inspection completed.
  11. Aug 26, 2024

    Foundation Insulation

    Partial Approval

    InspectorMike Lockman

    1.5" Rigid foam insulation on exterior of foundation w/ 6 mil slip sheet. Contractor says they are applying another 1.5" insulation board on the interior of foundation. Verity in future.
  12. Aug 26, 2024

    Foundation Waterproofing

    Completed

    InspectorMike Lockman

    Spray applied waterproofing from top of footing to top of foundation wall
  13. Aug 20, 2024

    Footing

    Completed

    InspectorMike Lockman

    20x8 Strip footings w/ (2) #4 bar at bottom on suspended 2" above bottom of footing. Pinned into existing footings at intersecting locations w/ (2) #4 pins at each location.

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.