Building
1637 Kelly Dr, Golden Valley
New, New construction of a 1-story ADU and garage.
- Oct 15, 2025
Blower Door Test
CompletedInspectorDan Anderson
- Oct 13, 2025
Energy Code-Lighting Schedule Form
CompletedInspectorDan Anderson
Bret confirmed all lights are LED
- Oct 13, 2025
As-Built Survey
CompletedInspectorDan Anderson
- Oct 6, 2025
Other - Smoke & Carbon Alarm at Time of Final
CompletedInspectorBret Eggers
- Oct 6, 2025
Radon Control
CompletedInspectorBret Eggers
- Oct 6, 2025
Submit Pictures of House Wrap
CompletedInspectorBret Eggers
- Oct 6, 2025
Verify Electrical Final
CompletedInspectorBret Eggers
- Oct 6, 2025
Final
Need CorrectionInspectorBret Eggers
All corrections from 9/2 completed. Current outstanding correction- Roof issues not addressed
- Sep 2, 2025
Other-Slab On-Grade Perimeter Insulation
CompletedInspectorMike Lockman
Insulation is integral with the forms used for footings/foundation
- Sep 2, 2025
Soil Test - Req`d Before Footing
CompletedInspectorMike Lockman
Geo report loaded into Pdox. Dated 7-26-2024
- Sep 2, 2025
Insulation
CompletedInspectorMike Lockman
SIP panels installed for exterior walls and roof. R-21.1 @ walls and R-49 @ roof assembly per manufacturer
- Sep 2, 2025
Final
Need CorrectionInspectorMike Lockman
1. Electrical final had not yet been completed at time of final inspection 2. Anti-tip device not installed on range as required by manufacturer 3. Hole in garage ceiling for electrical repair has not been repaired 4. Radon venting has not been completed and terminated thru roof 5. Relief piping not completed on water heater or boiler 6. House address not posted on exterior of home 7. Floor shall be sealed at shower/floor intersection ( hallway bathroom ) 8. CO alarm required outside of 2nd bedroom ( back side of home ) 9. Screening require for outdoor AC condenser units
- Sep 2, 2025
Other - Smoke & Carbon Alarm at Time of Final
Need CorrectionInspectorMike Lockman
Missing CO alarm outside of 2nd bedroom on back side of home
- Sep 2, 2025
Submit Pictures of House Wrap
Not ApprovedInspectorMike Lockman
HW photos not provided by contractor at time of final inspection
- Sep 2, 2025
Submit Pictures of Ice & Water Shield
Not ApprovedInspectorMike Lockman
Photos not provided by contractor at time of final inspection or inspection called in for
- Sep 2, 2025
Verify Electrical Final
Not ReadyInspectorMike Lockman
Electrical final has not been completed as of date of final inspection
- Sep 2, 2025
Energy Code-Lighting Schedule Form
Not ReadyInspectorMike Lockman
Report not provided by contractor as of time of inspection
- Sep 2, 2025
As-Built Survey
Not ReadyInspectorMike Lockman
As-Built survey has not been provided by contractor at time of inspection
- Sep 2, 2025
Blower Door Test
Not ReadyInspectorMike Lockman
Report has not been provided by contractor at time of inspection
- Sep 2, 2025
Drain Tile
Not RequiredInspectorMike Lockman
Slab on grade construction - DT not required
- Aug 29, 2025
Final
Completed in Future.InspectorMike Lockman
Verify the installation of the above grade radon pipe and a down tube at the relief valve on the water heater. Close out plbg permit GV124587 if completed
- May 20, 2025
Framing
CompletedInspectorMike Lockman
SIP installed substantially compliant w/ engineered drawings. Verified compliant support at point loads below structural beams. Electrical RI sticker dated 5/15/25
- May 19, 2025
Framing
Cancelled AppointmentInspectorMike Lockman
Cancelled by contractor. Will reschedule
- Apr 14, 2025
Framing
CompletedInspectorBret Eggers
- Apr 8, 2025
Insulation - Under Slab
CompletedInspectorMike Lockman
2" R10 foam insulation installed under entire slab and taped at seams
Show 10 earlier inspections
- Apr 8, 2025
Foundation Insulation
CompletedInspectorMike Lockman
R10 minimum insulation installed on interior and exterior of foundation. Slab on grade.
- Apr 8, 2025
Floor Slab
CompletedInspectorMike Lockman
- Apr 8, 2025
Foundation Waterproofing
Not RequiredInspectorMike Lockman
Slab on grade system. Balanced fill at foundation
- Apr 8, 2025
Radon Control
Partial ApprovalInspectorMike Lockman
6 mil vapor barrier installed. Taped at seams and at all penetrations
- Apr 3, 2025
Foundation Insulation
Cancelled AppointmentInspectorMike Lockman
Inspection cancelled by contractor
- Apr 3, 2025
Site - Verify Setbacks at Footing Inspection
CompletedInspectorMike Lockman
- Apr 1, 2025
Footing
CompletedInspectorMike Lockman
Footings are SCWAP and engineering. Slab on grade w/ shallow footing system per ASCE-32
- Apr 1, 2025
Footing - Reinforcing
CompletedInspectorMike Lockman
(2) #4 bar at both top and bottom. SCWAP
- Apr 1, 2025
Radon Control
Partial ApprovalInspectorMike Lockman
3" Perforated piping below slab. Compliant w/ Mn IRC requirements
- Mar 28, 2025
Radon Control
Not ApprovedInspectorMike Lockman
The underground radon piping failed to meet the requirements of Mn Rule 1303.2402 in the Mn Residential Building Code. Re-inspection is required