Permit / Golden Valley← Search
#GV124160

Building

7155 Medicine Lake Rd, Golden Valley

IssuedApr 8, 2025
StatusUnknown
Value$125,000
Inspections16
Scope of work

Remodel/Alteration, WAREHOUSE/OFFICE-Build out of Old Service Station, no additional work in the warehouse building,

Location context
Parcel2911821210056
Coordinates45.00727, -93.37144
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$785.53
Total paid$785.53
Timeline
ApprovedApr 2, 2025
IssuedApr 8, 2025
Inspection record
Inspections16
Passed14
Failed0
  1. Sep 12, 2025

    Verify Fire Final

    Completed

    InspectorDan Anderson

    approved by KJ 9/11/25
  2. Aug 20, 2025

    Verify Fire Final

    Need Correction

    InspectorBrian Stemwedel

    Visual alarm identified in FA Plan review needs to be installed in bathroom in new office space (Public Area) [907.5.2.3.1 Public use areas and common use areas.] Provide a visible alarm in bathroom (Public use area) Visible alarm notification appliances shall be provided in public use areas and common use areas. It does not appear you have 20% spare capacity; therefore, the exception does not apply.
  3. Aug 11, 2025

    Final

    Completed

    InspectorBrian Stemwedel

    Contractor sent picture of installed emergency light at exterior. ok to approve and close permit upon verification of electrical final and fire final
  4. Jul 17, 2025

    Final

    Completed in Future.

    InspectorBrian Stemwedel

    Emergency lighting @ exit discharge [1008.3.2(5) MSBC] Verify Fire final Verify electrical final
  5. Jul 9, 2025

    Flat Roof/Tear-Off

    Completed

    InspectorBrian Stemwedel

  6. Jul 9, 2025

    Insulation

    Completed

    InspectorBrian Stemwedel

    DC 315 intumescent applied over SPF in exterior wall where exposed in plenum. Installer Statement entered into City archive
  7. Jul 9, 2025

    Insulation-Roof Insulation

    Completed

    InspectorBrian Stemwedel

  8. Jun 12, 2025

    Framing

    Completed

    InspectorBret Eggers

  9. Jun 12, 2025

    Framing-Above Ceiling

    Completed

    InspectorBret Eggers

  10. Jun 12, 2025

    Insulation

    Completed in Future.

    InspectorBret Eggers

    Complete when Intumesecnt report approved
  11. May 23, 2025

    Floor Slab

    Completed

    InspectorBrian Stemwedel

    slab connecting office to building
  12. May 23, 2025

    Footing

    Completed

    InspectorBrian Stemwedel

    grade beam connecting buildings per agreement
  13. May 23, 2025

    Insulation - EIFS /Flashing details

    Completed

    InspectorBrian Stemwedel

    details at infills
  14. May 23, 2025

    Submit Pictures of House Wrap

    Completed

    InspectorBrian Stemwedel

    sealed at perimeter against ex. EIFS
  15. May 23, 2025

    Wall Reinf. inspect @ 4` lift prior to grout

    Not Required

    InspectorBrian Stemwedel

    changed to grade beam connection buildings 5' apart. supported each end on ex. foundation(s)
  16. Apr 29, 2025

    Other

    Completed

    InspectorBrian Stemwedel

    Met with design/ build team on site. went over exterior envelope/ havc concerns and went over expectations for Code requirements relating to energy Code. informed permit holder that changes to the design would require plan revisions for our records