#GV124158Building
800 Parkview Ter, Golden Valley
IssuedMay 15, 2025
StatusUnknown
Value$75,000
Inspections18
Scope of work
Addition, Remodel/Alt. existing garage
Location context
Parcel3002924140013
Coordinates44.97279, -93.32969
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$568.75
Total paid$568.75
Timeline
ApprovedMay 14, 2025
IssuedMay 15, 2025
Inspection record
Inspections18
Passed14
Failed0
- Dec 9, 2025
Other - Smoke & Carbon Alarm at Time of Final
CompletedInspectorBret Eggers
- Dec 9, 2025
Floor Slab-Reinforcement
CompletedInspectorBret Eggers
Pics provided on site
- Dec 9, 2025
Verify Electrical Final
CompletedInspectorBret Eggers
- Dec 9, 2025
Site - Verify Setbacks at Footing Inspection
CompletedInspectorBret Eggers
no issues
- Dec 9, 2025
Final
CompletedInspectorBret Eggers
- Dec 9, 2025
Radon Control
Not RequiredInspectorBret Eggers
- Dec 5, 2025
Final
No ShowInspectorMike Lockman
Contractor was not on site at time of inspection. Waited 25 minutes and then had to leave for my next inspection
- Sep 16, 2025
Submit Pictures of House Wrap
CompletedInspectorBret Eggers
With lathe inspection
- Sep 16, 2025
Lath
CompletedInspectorBret Eggers
- Aug 8, 2025
Insulation
CompletedInspectorMike Lockman
FG batt insulation w/ compliant VB
- Aug 5, 2025
Framing
CompletedInspectorBret Eggers
- Aug 1, 2025
Framing
Cancelled AppointmentInspectorMike Lockman
- Jul 15, 2025
Floor Slab-Reinforcement
Completed in Future.InspectorBrian Stemwedel
Contractor was not ready and leveling sub grade (under rigid foam) told him to take pictures of insulation, reinforcement (on chairs) and provide pictures at next inspection for review. told him he was ok to cast slab once insulation and reinforcement was documented with pictures
- Jul 14, 2025
Floor Slab
Cancelled AppointmentInspectorMike Lockman
Cancelled by contractor. Will reschedule
- Jun 26, 2025
Wall Reinf. inspect @ 4` lift prior to grout
CompletedInspectorBrian Stemwedel
6" CMU wall, reinforcement and core filled @ anchor bolt locations (Balanced fill)
- Jun 26, 2025
Foundation Insulation
CompletedInspectorBrian Stemwedel
2" rigid @ interior fnd. wall
- Jun 2, 2025
Footing
CompletedInspectorBret Eggers
- Jun 2, 2025
Footing - Reinforcing
CompletedInspectorBret Eggers