Building

4115 Leber La, Golden Valley

IssuedJul 28, 2025
StatusUnknown
Value$292,000
Inspections14
Scope of work

Addition, Additoin. Includes 1 stall garage, mudroom on main floor. Primary suite on 2nd floor. Kitchen

Location context
Parcel1902924440084
Coordinates44.97811, -93.33158
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$1,436.83
Total paid$1,436.83
Timeline
ApprovedJul 28, 2025
IssuedJul 28, 2025
Inspection record
Inspections14
Passed13
Failed0
  1. Dec 17, 2025

    Final

    Completed

    InspectorMike Lockman

  2. Dec 16, 2025

    Submit Pictures of House Wrap

    Completed

    InspectorMike Lockman

    Submitted via email
  3. Dec 16, 2025

    Submit Pictures of Ice & Water Shield

    Completed

    InspectorMike Lockman

    Submitted via email
  4. Dec 16, 2025

    Other - Smoke & Carbon Alarm at Time of Final

    Completed

    InspectorMike Lockman

    Smoke & CO alarms are compliant
  5. Nov 20, 2025

    Final

    Not Ready

    InspectorMike Lockman

    Verify at final that plumbing GV129147 and mechanical GV127635 have been completed. Plumbing & mechanical were not completed at the time these finals were scheduled
  6. Oct 15, 2025

    Lath

    Completed

    InspectorBret Eggers

  7. Sep 16, 2025

    Insulation

    Completed

    InspectorMike Lockman

    Un-faced FG batt insulation / R20 w/ VB. CCSF at rim joist. Garage is fully insulated
  8. Sep 11, 2025

    Framing

    Completed

    InspectorMike Lockman

    Framing is SCWAP. Verified electrical RI sticker dated 9-11-25
  9. Sep 11, 2025

    Drain Tile

    Not Approved

    InspectorMike Lockman

    Contractor failed to call for DT inspection
  10. Aug 11, 2025

    Wall Reinf. inspect @ 4` lift prior to grout

    Completed

    InspectorBrian Stemwedel

    Approved via email
  11. Aug 11, 2025

    Foundation Insulation

    Completed

    InspectorBrian Stemwedel

    Draining type insulation installed at foundation exterior from top of footing to top of wall. approved via pictures
  12. Aug 11, 2025

    Foundation Waterproofing

    Completed

    InspectorBrian Stemwedel

    Asphalt spray applied WP at foundation @ exterior. approved via pictures
  13. Aug 11, 2025

    Footing - Reinforcing

    Completed

    InspectorBrian Stemwedel

    (2) #4's cont.
  14. Jul 30, 2025

    Footing

    Completed

    InspectorBrian Stemwedel

    20x8 footings per plans w/ 2 #4's continuous