PULLFIRST[THE RECORD]
Permit / Golden Valley← Search
#GV127821

Plumbing

380 Laurel Curve, Golden Valley

IssuedAug 26, 2025
StatusUnknown
Value$15,000
Inspections6
Scope of work

New, 3 bathrooms, kitchen, laundry, mechanical room, pantry sink

Location context
Parcel0511721210097
Coordinates44.97581, -93.37506
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$397.3
Inspection record
Inspections6
Passed6
Failed0
  1. Feb 6, 2026

    Final

    Completed in Future.

    InspectorMike Lockman

    Contractor asked to do inspection at the same time as the final inspection for 320 Laurel curve but there was not enough time in the 30 minute time frame for both.
  2. Nov 20, 2025

    Shower Pan ( if CT shower is being installed)

    Completed

    InspectorMike Lockman

    Schluter shower liner system. Passed flood test. Drains without pooling water
  3. Oct 24, 2025

    Rough-In (Air Test-Plbg)

    Completed

    InspectorMike Lockman

    Pvc W&V RI for new home construction. Holding 5# test for duration of the inspection. Pex water piping. Verified radon vent piped and terminated thru roof w/ R4 insulation
  4. Oct 24, 2025

    Visual

    Completed

    InspectorMike Lockman

  5. Sep 12, 2025

    Rough-In (Air Test-Plbg)

    Partial Approval

    InspectorMike Lockman

    UG radon piping w/ 3" sch 40 pvc run & stubbed above concrete. Perforated pvc installed 10 ft in 2 directions within the aggregate layer
  6. Aug 27, 2025

    Rough-In (Air Test-Plbg)

    Partial Approval

    InspectorBrian Stemwedel

    Underground DWV (PVC) held air for duration of inspection