Permit / Golden Valley← Search
#GV128178

Building

1850 Hampshire La, Golden Valley

IssuedNov 6, 2025
StatusUnknown
Value$70,000
Inspections13
Scope of work

Addition, 2 story addition

Location context
Parcel2911821420014
Coordinates44.99899, -93.36845
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$544.9
Total paid$544.9
Timeline
ApprovedOct 23, 2025
IssuedNov 6, 2025
Inspection record
Inspections13
Passed12
Failed0
  1. Mar 24, 2026

    Final

    Completed

    InspectorMike Lockman

    Final inspection approved. Smoke & CO alarms are compliant. Verified sticker for electrical final in panel dated 2/23/26. Exterior grading will be completed once the weather permits.
  2. Dec 23, 2025

    Framing

    Completed

    InspectorGarrett Heins

    4 Red head anchors added to southwest wall bottom plate.
  3. Dec 23, 2025

    Insulation

    Completed

    InspectorGarrett Heins

    Fiberglass insulation main level addition, R-49 roof, R-21 walls. Close cell spray foam for rim and basement addition against masonry. Vapor retarder with acoustical caulking over fiber glass insulation.
  4. Dec 19, 2025

    Submit Pictures of House Wrap

    Completed

    InspectorGarrett Heins

    Viewed at time of framing inspection.
  5. Dec 19, 2025

    Submit Pictures of Ice & Water Shield

    Completed

    InspectorGarrett Heins

    View photos at time of framing inspection. Ridge vent verified.
  6. Dec 19, 2025

    Framing

    Need Correction

    InspectorGarrett Heins

    Anchor bolts required bottom plate on west wall. Approved engineered anchors allowed. SEE R403.1.6
  7. Nov 18, 2025

    Drain Tile

    Completed

    InspectorMike Lockman

    Exterior DT installed. Will terminated in a french drain in back yard
  8. Nov 18, 2025

    Floor Slab-Reinforcement

    Completed

    InspectorMike Lockman

    #4 FG bar reinforcement @ 24" OC EW
  9. Nov 13, 2025

    Foundation Insulation

    Completed

    InspectorMike Lockman

    ICF walls w/ 2" R10 in interior and exterior plain.
  10. Nov 13, 2025

    Foundation Waterproofing

    Completed

    InspectorMike Lockman

    Mel-Roll 60 mil self-adhering waterproofing membrane installed on exterior of ICF foundation
  11. Nov 13, 2025

    Wall Reinf. inspect @ 4` lift prior to grout

    Completed

    InspectorMike Lockman

    #5 Bar pinned @ 4 ft OC into strip footing and into existing foundation. #5 vertical bar @ 4 ft OC SCWAP. #4 FG bar horizontal @ 16 in OC for entire height of wall.
  12. Nov 12, 2025

    Footing - Reinforcing

    Completed

    InspectorBret Eggers

    As per approved plans
  13. Nov 12, 2025

    Footing

    Completed

    InspectorBret Eggers

    As per approved plans

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.