PULLFIRST[THE RECORD]
Permit / White Bear Lake← Search
#WB090524

Building

2507 Jansen Ave, White Bear Lake

IssuedOct 1, 2024
StatusUnknown
Value$301,158
Inspections14
Scope of work

New, NEW TOWNHOME (4 of 5)

Fees & payments
Total fees$4,867.41
Inspection record
Inspections14
Passed13
Failed0
  1. Apr 2, 2026

    Final Building Inspection

    Partial Final

    InspectorBEN EGGAN

    Final approved pending: 1. Pour curb and restore boulevard landscaping 2. Provide Final Inspection Summary Report from Braun 3. Obtain rain garden approval from Connie Taillon 4. Install Handicap parking sign 5. Caulk all AC lines at exterior of the building 6. Repair and add flashing to fully cover foundation insulation
  2. Oct 30, 2025

    Shear Wall

    Approved

    InspectorBEN EGGAN

  3. Sep 30, 2025

    Insulation

    Approved

    InspectorBEN EGGAN

  4. Sep 8, 2025

    Framing

    Approved

    InspectorBEN EGGAN

  5. Aug 5, 2025

    Lath

    Approved

    InspectorBEN EGGAN

  6. Jul 11, 2025

    House Wrap (Email Pictures or On-Site Inspection)

    Approved

    InspectorBEN EGGAN

  7. Jun 12, 2025

    Floor Poly

    Approved

    InspectorWILLY WEICHT

  8. Jun 9, 2025

    Radon

    Partial Pass

    InspectorWILLY WEICHT

    4" PVC pipe and 4" PVC pipe with sock in ground. Rock was already covering pipe and pictures were provided. None of above ground was completed at this inspection.
  9. May 30, 2025

    Wall Bracing (Pre-Housewrap)

    Approved

    InspectorWILLY WEICHT

  10. Dec 17, 2024

    Rough Drain Tile

    Approved

    InspectorWILLY WEICHT

  11. Dec 16, 2024

    Foundation Pre-Backfill

    Approved

    InspectorWILLY WEICHT

  12. Dec 16, 2024

    Water Proofing

    Approved

    InspectorWILLY WEICHT

  13. Dec 3, 2024

    Foundation Pre-Pour

    Approved

    InspectorWILLY WEICHT

    Adding additional #4 rebar to have 18" or 24" each way per engineering. Blankets were on site to cover after wall is poured.
  14. Nov 15, 2024

    Footing

    Approved

    InspectorWILLY WEICHT

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.