#SA034700

Building

8996 154 St W, Savage

IssuedJul 9, 2024
StatusUnknown
Value$35,000
Inspections13
Scope of work

Alteration, relocating the interior stairs and adding three patio doors, new kitchen, new egress window

Location context
Fees & payments
Total fees$25
Total paid$25
Timeline
ApprovedJul 9, 2024
IssuedJul 9, 2024
Inspection record
Inspections13
Passed8
Failed0
  1. Oct 1, 2024

    Final

    Approved

    InspectorPhillip Skluzacek

  2. Sep 26, 2024

    Smoke Detector & Carbon Monoxide

    Approved

    InspectorPhillip Skluzacek

  3. Sep 26, 2024

    Window/Door Final

    Approved

    InspectorPhillip Skluzacek

  4. Sep 26, 2024

    Final

    Call For Reinspection

    InspectorPhillip Skluzacek

    Handrails need to be 34-38" from nose of stairs and need to withstand 200lbs of pressure.
  5. Aug 8, 2024

    Insulation

    Approved

    InspectorDavid Hauer

  6. Aug 8, 2024

    Window/Door Mid Installation

    Approved

    InspectorDavid Hauer

  7. Aug 7, 2024

    Framing

    Approved

    InspectorDavid Hauer

  8. Aug 7, 2024

    Insulation

    Call For Reinspection

    InspectorDavid Hauer

    1. Complete wall at back of home. 2. Seal vapor barrier. 3. Insulate basement rim floor joist area. 4. Insulate above closet ceiling in garage area. 5. Block above wall in mechanical room joist area. 6. Vapor barrier at shower wall. 7. Draftstop areas at wall to floor joist areas at basement bathroom chases. 8. Install bathroom fan. 9. Close off return duct at mechanical room wall. 10. Draftstop basement bedroom soffit 10 feet or less. 11. Re-check GLAT- pressure wrote on wall stud.
  9. Aug 2, 2024

    Framing

    Call For Reinspection

    InspectorDavid Hauer

    Complete item 2 and 4 from previous correction on 7- 30- 24
  10. Aug 2, 2024

    Insulation

    Not Ready

    InspectorDavid Hauer

  11. Jul 30, 2024

    Framing

    Call For Reinspection

    InspectorDavid Hauer

    1. Revise plans to show 8 foot back patio door. Need header and trimmer documentation. 2. Electrical RI approval. 3. Missing hanger nails joist to beam. 4. Complete basement framing. 5. Add wall near entry door for gas line.
  12. Jul 16, 2024

    Footing

    Approved

    InspectorDavid Hauer

    Licensed engineer that provided structural plans provided documentation that stair strip footings are not required.
  13. Jul 10, 2024

    Footing

    Partial Approval

    InspectorDavid Hauer

    Pad footings okay. Stair strip footing not done.

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.