Building
7806 146 Ter, Savage
New, Detached
- Dec 10, 2025
Fireplace Final
ApprovedInspectorPhillip Skluzacek
- Dec 10, 2025
Mechanical Final
ApprovedInspectorPhillip Skluzacek
- Dec 10, 2025
Plumbing Final
ApprovedInspectorPhillip Skluzacek
- Dec 10, 2025
Temporary Certificate of Occupancy
ApprovedInspectorPhillip Skluzacek
- Dec 1, 2025
Turf and Landscaping
Call For ReinspectionInspectorIgor Khomyakov
Snow on the ground does not allow for physical verification of turf on Lot 6 and stabilization on vacant lot & wetland.
- Dec 1, 2025
As-built/grading
Not ApprovedInspectorIgor Khomyakov
Survey received 11/26/25. Snow on the ground does not allow for physical verification of grades. All notes based on Survey Existing Spot Elevations. 1. Non draining swale South of High Point on West property line to SW house corner. Potentially blocked with landscaping.
- Nov 13, 2025
Lath
ApprovedInspectorPhillip Skluzacek
- Nov 13, 2025
Erosion Control
Erosion Control ApprovedInspectorPhillip Skluzacek
- Oct 15, 2025
Insulation
Work completed-City did not inspectInspectorJason Wolf
Walls and penetrations are compliant. Entire ceiling sheetrocked and not able to inspect from the ceiling up.
- Oct 13, 2025
Plumbing Rough-In
ApprovedInspectorJason Wolf
- Oct 13, 2025
Framing
ApprovedInspectorJason Wolf
- Oct 13, 2025
Fireplace Rough-In
ApprovedInspectorJason Wolf
- Oct 13, 2025
Gas Line Air Test
ApprovedInspectorJason Wolf
Main/Dryer/FP
- Oct 13, 2025
Mechanical Rough-In
ApprovedInspectorJason Wolf
- Oct 13, 2025
Sheathing
ApprovedInspectorJason Wolf
- Oct 13, 2025
Erosion Control
Erosion Control ApprovedInspectorJason Wolf
- Sep 17, 2025
In Floor Heat
ApprovedInspectorJason Wolf
60psi on both garage and house
- Sep 16, 2025
Radon Mitigation System/Poly
ApprovedInspectorPhillip Skluzacek
- Sep 16, 2025
Erosion Control
Erosion Control ApprovedInspectorPhillip Skluzacek
- Sep 15, 2025
Plumbing Underground
ApprovedInspectorJason Wolf
- Sep 15, 2025
Erosion Control
Erosion Control ApprovedInspectorJason Wolf
- Sep 11, 2025
Erosion Control
Not ApprovedInspectorDavid Hauer
1. Erosion control fencing or bio logs must be installed at street and sidewalk. 2. Re- install all perimeter control. 3. Street and side walk must be kept clean. 4. All areas a curb that are disturbed must have erosion control. 5. Remove all building material, biffy, and other items from boulevard and right of way. 6. All track out from sites and out lots where materials are currently sitting must also stay clean on street, sidewalk, and have erosion control in place. 7. Install erosion control around stock piles- dirt. Correct by September 15th at 3 p.m. or stop work order issued. No inspections until corrected.
- Aug 28, 2025
Foundation
ApprovedInspectorJason Wolf
- Aug 26, 2025
Poured Wall
ApprovedInspectorJason Wolf
- Aug 26, 2025
Erosion Control
Erosion Control ApprovedInspectorJason Wolf
Show 2 earlier inspections
- Aug 25, 2025
Footing
ApprovedInspectorPhillip Skluzacek
Soil correction in file
- Aug 25, 2025
Erosion Control
Erosion Control ApprovedInspectorPhillip Skluzacek