#MI290588

Building

1520 Clare La, Minnetonka

IssuedJun 23, 2025
StatusUnknown
Value$7,675,695
Inspections39
Scope of work

New, Memory Care

Location context
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedJun 12, 2025
IssuedJun 23, 2025
Inspection record
Inspections39
Passed12
Failed0
  1. Apr 3, 2026

    Above Ceiling

    APPROVED

    InspectorBrian Stemwedel

    looked at fire tape in kitchen, approved ok to install FRP DID NOTICE THAT FIRE WRAP STOPPED AT GYP CEILING, NEED TO VERIFY PROPER WRAP AT DUCT BELOW LID (STAGGER)
  2. Apr 2, 2026

    Above Ceiling

    SEE COMMENTS

    InspectorChris Weaver

    FIRE CAULK AND HANGER CORRECTION WALKTHROUGH
  3. Apr 1, 2026

    Above Ceiling

    SEE COMMENTS

    InspectorChris Weaver

    FIRE CAULK AND HANGER WALKTHROUGH
  4. Mar 31, 2026

    Above Ceiling

    CANCELLED APPOINTMENT

    InspectorDale Gronberg

  5. Mar 31, 2026

    House Wrap/Lathing

    PARTIAL APPROVAL

    InspectorDale Gronberg

    * Lathe on north end of east wall okay up to the FD connection
  6. Mar 26, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    ABOVE CEILING, STILL FIRE CAULKING TO DO, NORTH WING
  7. Mar 25, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    ABOVE CEILING PRIOR TO HANGING ROCK SOME PATCHING AND FIRE CAULK REQUIRED, WILL SEND PICTURES
  8. Mar 24, 2026

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  9. Mar 23, 2026

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  10. Mar 20, 2026

    Commercial Framing

    NOT READY

    InspectorBrian Stemwedel

    work not ready to inspect
  11. Mar 19, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    SOUND INSULATION IN CENTER ISLAND WALLS AND SOUND CHANNEL WILL BE REQUIRED ON UNIT CORIDOOR WALLS
  12. Mar 13, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorBrian Stemwedel

    looked at Poly and tape in the center/ common area lid. also shear walls in south wing, screw pattern adequate. At smoke barrier (smoke compartment separation) the Gyp was not extending behind the frame, per NFPA 80, it must extend behind the frame 1/2" around the perimeter. also talked to sean about wrapping the framing, but after checking this is not required (i called to let him know)
  13. Mar 11, 2026

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  14. Mar 10, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    --DISCUSSED MAIN GAS VALVE READY ACCESS --STILL NEED DETAIL ON DUCT THROUGH WALLS TO MECHANICAL TUNNELS POLY ON CORIDORS
  15. Mar 6, 2026

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    poly lid in plan west corridor and center common space OK to gyp lid
  16. Mar 4, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    --NEED DETAIL REGARDING FIRE RATING OF TUNNEL PENETRATION OF MUA DUCT FROM OUTSIDE. NEED ASSEMBLY NUMBER TO CORRECTLY INSPECT AREA POLY IN NORTH WING. GREASE DUCT INSULATION IS ON AND ACCESS DOOR HAS BEEN CUT. LINE SETS PEIRCING POLY ARE IN CLOSE CONTACT WITH SOUND CHANNEL CUT TO ACCOMODATE LINE SETS, SHARP EDGES TO BE PROTECTED MAIN GAS LINES MUST BE LABELED "2 PSI GAS"
  17. Mar 2, 2026

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  18. Mar 2, 2026

    Commercial Insulation

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  19. Feb 27, 2026

    Commercial Insulation

    SEE COMMENTS

    InspectorBrian Stemwedel

    SE Wing: SPF @ exterior walls, plan called for 3.5 ", installed was that at a min. and in most cases exceeded 3.5. Unit dimising wall sound insulation (FG batt, also serves as draftstopping for 10' hor. requirement). Also looked at sound channel installation of corridor lid and corridor/ unit walls per plans. contractor were nor installing SC at 12" O.C. eliminating previous concerns where SC exceeded 12" O.C.
  20. Feb 26, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    CHECKED EXTERIOR SHEAR WALLS NAILING PATTERNS, OK NORTH WING SHEAR WALLS HOLD DOWN OK, DEMISING WALLS TO HAVE BRACKETS ON TOP TO HOLD WALL IN PLACE OK TO POLY
  21. Feb 25, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorBrian Stemwedel

    North wing shear walls Nut not seated @ hold down unit 112, verify at next inspection. all other shear walls looked good, need detail per C.W. notes on 2/23 South wing ceiling sound channel, detail shows S.C.@ 12" O.C., some areas were about 16" O.C. (per Sean this was approved by designer), provide documentation this is acceptable.
  22. Feb 23, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    DISCUSSED SHEAR WALL TOP PLATE FASTENING, SHEATHING TO BE UNINTERUPTED
  23. Feb 20, 2026

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorBrian Stemwedel

    Plan SW corner units123-126 VB and insualtion for pre rock upper 4' of corridor walls
  24. Feb 18, 2026

    Commercial Framing

    CANCELLED APPOINTMENT

    InspectorChris Weaver

  25. Feb 17, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    SOUTH WING HOLD DOWNS AND POLY FOR PREROCK
Show 14 earlier inspections
  1. Feb 10, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    TRUSS FRAMING INSPECTIONS COMPLETE AS OF 2/10 PREVIOUS ISSUES HAVE BEEN CORRECTED DISCUSSED INSULATING OF THE STAIR CHASES, DRYWALL AND SPRAY FOAM WAS DECIDED UPON
  2. Feb 9, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    SOUTH WING COMPLETED, MISC LATTERALS MISSING, MISSING DOUBLE STUDS UNDER GIRDER TRUSSES, TRUSS FIX INCORRECT - MUST BE LAMINATED ON BOTH FACES. LEFT OFF AT KITCHEN
  3. Feb 9, 2026·9:00 AM - 10:00 AM

    Commercial Framing

    scheduled

    InspectorChris Weaver

  4. Feb 6, 2026

    Commercial Framing

    PARTIAL APPROVAL

    InspectorDale Gronberg

    *TRUSS BRACING INSPECTION* * A very complex truss system which will take a couple inspections to complete * Started from plan north through unit 127 (OK) * Add nailing to girder H57GR * Warm walls to attic space must meet energy code
  5. Feb 5, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorChris Weaver

    DISCUSSED FRAMING INSPECTIONS AS WE MOVE FORWARD -TRUSS SPECS AND LAYOUT WILL BE AVALIABLE AT TIME OF INSPECTION FOR AREA TO BE INSPECTED -HEADDERS, KING, JACK REQUIREMENTS THEY STILL PLAN TO PUT VERTICAL DOORS IN THE MECHANICAL PITS TO WALKWAYS ACROSS THE ATTIS TO NOTHING. cOULD ACT AS ONLY ACCESS TO ATTIC?
  6. Oct 28, 2025

    Radon

    APPROVED

    InspectorBrian Stemwedel

    Under slab radon barrier lapped and taped as required. all penetrations sealed. OK to cast slab
  7. Sep 15, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorChris Weaver

    WAITING ON MECHANICAL PAD FOR DISPOSABLE FORMS LAST BIT OF WALL AT BACK, SOUTH SIDE
  8. Sep 4, 2025

    Poured Wall

    SEE COMMENTS

    InspectorChris Weaver

    ANOTHER SECTION OF POURED WALL, NOTES ON PLANS REBAR AS PER PLAN
  9. Aug 28, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorChris Weaver

    POURED WALL, LOCATIONS MARKED ON PLANS, REENFORCEMENT AS PER PLAN
  10. Aug 22, 2025

    Foundation Rebar/Form

    PARTIAL APPROVAL

    InspectorMarshall Lind

    South end going from West to East wall jog, Marked on plans/No grid lines
  11. Aug 20, 2025

    Commercial Footing

    SEE COMMENTS

    InspectorChris Weaver

    POURED WALLS AROUND EAST SIDE, MARKED ON PLANS
  12. Aug 15, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorDale Gronberg

    * Footings as marked on job plan * CF1-8, CF6 and F4.5 pads per plan * SE corner needs rebar cut back 2" for clearance to forms * 90% of footings done. West side needs to stay for site entry
  13. Aug 15, 2025

    Foundation Rebar/Form

    PARTIAL APPROVAL

    InspectorDale Gronberg

    * Poured walls as noted on job plans (OK)
  14. Aug 12, 2025

    Commercial Footing

    PARTIAL APPROVAL

    InspectorChris Weaver

    ---REQUESTED PLAN FOR MARK-UPS IN TRAILER, GC WILL MARK UP WHAT WAS COMPLETED STRIP FOOTINGS NEARLY COMPLETE BEING FORMED AND TIED, NO GRIDS ON PLANS ALL AS PER PLAN